Monday, December 11, 2023
Nothing on the Design Wall
Sunday, December 10, 2023
Stitching Stuff: Week 48 of 2023
Just 3 more weeks left in 2023! That's really hard to take in. Have you started crafting your goals for 2024? I've given mine some thought here and there. I've made a start on my quilt plan for next year, but that's about it in terms of written commitments. The 15 minutes to Stitch/Stitching Stuff linky party will continue next year. Some days I still need encouragement to get into the sewing room. Though scrap and fabric management will be a bigger part of my Sunday linky party post in 2024. Fingers crossed I can keep that up next year.
It was a good week on the stitching front.
- 15 minute days/week = 7/7 days
- 15 minute days/Dec = 9/9 days
- 15 minute days/2023 = 291/343 days
- Success rate = 84.84%
Four - 4 yard cuts, one yard cut and a half yard cut are all now pressed and neatly folded in the fabric closet. I'm getting to the bottom of the bin. Looks like I'll be pressing a lot of red fabrics this next week. There are more fabrics under those. Maybe another 2 weeks before this is completely empty?
| 1. Gretchen 2. maggie f 3. Julie in GA 4. Karen 5. DonnaleeQ | 6. katie z. 7. Laurie at Laurie's Place 8. Shasta @ High Road Quilter 9. Frédérique 10. Andrée | 11. Bonnie in Va 12. Melisa- Pinker n' Punkin Quilting 13. Jocelyn @CNN 14. Deb in Canada 15. Quilting Gail |
Powered by... Mister Linky's Magical Widgets.
Sunday, December 3, 2023
Stitching Stuff: Week 47 of 2023
I'm never ready for December. I just never seem to get to all things I had planned to finish before the end of the year. But to put a positive spin on that, it's also the month to start planning for 2024 and theoretically have the chance to make up for where you fell short this year (funny how it rarely works out that way). One area that has worked out well for me this year is my stitching time, this week was another good one.
- 15 minute days/week = 6/7 days
- 15 minute days/Nov = 24/30 days
- 15 minute days/Dec = 2/2 days
- 15 minute days/2023 = 284/336 days
- Success rate = 84.52%
Scrap bag #1 is just a bit less stuffed. It's hard to tell because when I pull out some of those long strips, it fluffs up the rest of the scraps. I didn't do much scrap processing this week because the fabric to be pressed bin had another 8 yard cut that needed to be pressed.
The print on white in the top photo was the 8 yard piece and the floral on white below it was 5 yards. I'm glad to have both pressed and ready to use. But that took almost 2 hours to do both. That's one reason the fabric bin as been so full for so long. It's hard to take time from stitching to do those chores. But I'm determined to spend my weekend morning sewing room time working on both scraps and getting my yardage organized. The to be pressed bin is now just half full. I think what's left is all 3 and 4 yard cuts. Not bad progress considering I've missed some weekends due to traveling and the holiday.
| 1. Frédérique 2. Gretchen 3. maggie f 4. Karen | 5. Another Stitching Nana 6. DonnaleeQ 7. Melisa- Pinker n' Punkin Quilting 8. Jennifer in Indy | 9. Bonnie in Va 10. Laurie - Laurie's Place 11. Quilting Gail |
Powered by... Mister Linky's Magical Widgets.
Sunday, November 26, 2023
Stitching Stuff: Week 46 of 2023
Hard to believe that Thanksgiving is over and we are into the Christmas season already. With it being a holiday week, I tempered my expectations of getting in much stitching time. However, Grad Girl and I did manage a few sitting and stitching sessions over the holiday weekend.
- 15 minute days/week = 4/7 days
- 15 minute days/Nov = 20/25 days
- 15 minute days/2023 = 278/329 days
- Success rate = 84.5%
At least I stitched more days than I didn't this week. I'm still over my 75% stitching goal for the year, so I'm going to be happy with my efforts.
| 1. Gretchen 2. maggie f 3. Julie in GA 4. Karen | 5. Frédérique 6. DonnaleeQ 7. katie z. 8. Quilting Gail | 9. Andrée at Quilting & Learning 10. Bonnie in Va 11. Deb in Canada |
Powered by... Mister Linky's Magical Widgets.
Sunday, November 19, 2023
Stitching Stuff: Week 45 of 2023
Hard to believe that Thanksgiving is this Thursday. At this point I'm not ready. Lots to do between now and then. Likely my stitching time will suffer a bit this week. It's a good thing this last week was really good.
- 15 minute days/week = 7/7 days
- 15 minute days/Nov = 16/18 days
- 15 minute days/2023 = 274/322 days
- Success reate = 85.09%
| 1. Gretchen 2. maggie f 3. Julie in GA | 4. Karen 5. Quilting Gail 6. katie z. | 7. Bonnie in Va 8. Melisa- Pinker n' Punkin Quilting 9. Frédérique |
Powered by... Mister Linky's Magical Widgets.
Sunday, November 12, 2023
Stitching Stuff: Week 44 of 2023
Almost halfway through November? I'm definitely not ready for that, but as I can't change anything about that, I'm just hoping to keep going with the flow. That was pretty much what happened with my stitching time this week.
- 15 minute days/week = 6/7 days
- 15 minute days/Nov = 9/11 days
- 15 minute days/2023 = 267/315 days
- Success rate = 84.76%
Those scraps were dealt with pretty quickly and sorted into the scrap boxes. So I'm starting the week with an empty scrap bin. We'll see how long it stays empty.
It's hard to really judge how much progress there was. It amounted to 4 or 5 fat quarters, 2 half yard pieces, 1-1 yard piece and a wide backing fabric. The wide backing fabric took awhile to press and fold. But now it's ready if the right quilt comes up. I had purchased this wide backing for another project, but by the time the top was finished, I had misplaced it. Now that it's pressed, I've made a special place for it in the fabric closet. Hopefully that means I can find it when I need it next time.
| 1. Frédérique 2. maggie f 3. Karen | 4. Julie in GA 5. DonnaleeQ 6. Shasta @ High Road Quilter | 7. Andrée at Quilting & Learning 8. katie z. 9. Melisa- Pinker n' Punkin Quilting |
Powered by... Mister Linky's Magical Widgets.
Sunday, November 5, 2023
Stitching Stuff: Week 43 of 2023
I'm sorry this post is just a little late. I spent the day in Houston with Grad Girl and we didn't get back till late, so I slept in a bit today. Thankfully with time change it's not up as late as it would have been.
My stitching time has been a bit curtailed since I've been traveling, but I've had some hand stitching to work on in the evenings. I did well at working that in up until yesterday.
- 15 minute days/week = 6/7 days
- 15 minute days/Oct = 23/31 days
- 15 minute days/Nov = 3/4 days
- 15 minute days/2023 = 261/308 days
- Success rate = 84.74%
It's hard to tell I made any progress, but the overflow is at least not as likely to topple over if I bump it. So still lots of work to do on both fronts. The plan is to chip away on both fronts for the rest of the year.
Powered by... Mister Linky's Magical Widgets.
Sunday, January 22, 2023
Stitching Stuff: Week 3 of 2023
It was sunny and 61 F on Tuesday, so I went for a long walk. It was raining and 40 F today, so I stayed in the sewing room most of the day. I'm really ready for more of the 60 plus temps, but it sounds like we'll have to wait a few more weeks for that. Till then, it should be easy to get my stitching time in each week.
My routine seems to be developing again after all the interruptions due to the holiday and then getting sick. It was another excellent week on the stitching front.
- 15 minute days/week = 7/7 days
- 15 minute days/Jan = 19/21 days
- 15 minute days/2023 = 19/21 days
- Success rate = 90.48%
| 1. Gretchen 2. Ivani 3. Julie in GA 4. Karen 5. Michelle 6. Colletta's Kitchen Sink | 7. Melisa- Pinker n' Punkin Quilting 8. Frederique 9. Susan in TN 10. DonnaleeQ 11. Quilting Gail 12. maggie f | 13. Andre at Quilting and Learning 14. Lyndsey 15. Janice 16. Carol Andrews 17. Celine 18. Amanda |
Powered by... Mister Linky's Magical Widgets.
Saturday, October 4, 2014
Something Old, Something New: UFOs and Scrap Management
Thinking back that would have been posted sometime the weekend Drama Teen had ACL surgery and we had the roof damage that caused water to leak into the sewing room. Now I know why there wasn't a post for September. There probably wasn't much to report anyway, so I'll just proceed on to where things are now.
In terms of something old, Jigsaw finally became a finished quilt.
Drama Teen has slept with it every night since it's been finished. She obviously loves it.
Since Jigsaw is all finished up, I pulled out the box holding my oldest UFO and started putting it together. All the star blocks were finished I just had to cut the alternating blocks and decide on a layout. It looked like this back in August.
As of tonight, it only needs two more borders added before it will be a finished flimsy.
![]() |
Pattern is Folk Art Christmas Stars
by Robyn Pandolph
|
This quilt is intended for my Mother's bed, so it needs to be queen sized. Hopefully this one will be sent off to be quilted before the end of the month, but at the moment it's my something old for October.
I had to really think about the something new for September. I'm still wrestling with getting my stash organized, that includes my scraps. The Rainbow Scrap Challenge Sampler quilt has really helped me understand how to make good use of strips that are already cut, so I'm trying to get all the odds and ends into either squares or strips. My sewing time has been pretty limited and it's not fun to just stand and cut up scraps, but I think I came up with a workable system to "cut as I go". I've been using this blue bin to hold the color scraps I'm working with.
At the back of the bin are some plastic bags that I've labeled with the various strip sizes.
These bags serve two purposes. At the beginning of the month, I go through my already cut strips and pull out the color I'm working with that month. As I cut up any odd sized shapes, I sort the newly cut scraps back into these bags. At the end of the month the strips go back into the the general strip storage, when I pull out the next month's scraps. This keeps all the action at my cutting table and I'm not running back and forth to my scrap storage putting up or looking for scraps. Plus I know what sizes I have available. I did a pretty good job of getting most of the orange scraps cut up and stored without it seeming like I spent a lot of extra time cutting and organizing.
That's my update for last month. You can see more old and new projects over at Never Too Hot to Stitch.
Rainbow Scrap Challenge - From Orange to Brown, it's Definitely Fall
We are only three days into the month, but I've managed to get 15 minutes in the sewing room each day so far. That's my goal for the quarter, to spend at least 15 minutes in the sewing room every day for the rest of the year.
All of the last month's orange blocks for the Rainbow Scrap Challenge Sampler are finished.
![]() |
| Rainbow Scrap Challenge Sampler By Angela Feldbush of Soscrappy |
I'm still working on all the half square triangles needed for September's Inverted Star block.
![]() |
| Inverted Star by Jessica Boschem of Common Threads available from Craftsy as a free download |
This one should be finished by the end of the weekend and the brown one for October started.
All the brown fabrics have been gathered up; now to decide which ones go into this month's butterfly block.
I'm looking forward to a weekend of fun stitching. Hope you are too. For more scrappy fun check out all the links over at Soscrappy.
Saturday, May 17, 2014
Rainbow Scrap Challenge - Progress of a Sort
It was late by the time I got home from taking the girls to dinner. They had a sleep over at another friend's house, so I came home to an empty house. But there was still time to run up to the sewing room and print out the patterns for this month's green Rainbow Sampler blocks. After that was done, I scoured the scrap drawers for any green pieces. It appears that green isn't one of my go to colors, I don't have a lot of green scraps.
Nor do I have a lot of fat quarters in that color. Looks like another gap in the stash. I'll just have to work with what I have this weekend. But I've added a mental note to look for a few green fat quarters the next quilt shop trip that I make.
I'm still finishing up the purple blocks from last month, but hopefully a few green blocks will make it to the finished pile in time for next week's update. Till then check out the posts of greens over at Soscrappy.


































