Wednesday, July 22, 2026
To Do List for the Week of 7/21/2026
Monday, July 20, 2026
Just Following the Strategy - Mostly
We had a busy, but fun weekend. My Guy's niece got married in Dallas. It was a beautiful wedding. And of course we got to see family, some we've not seen in more than 10 years. My Girl was able to drive up from Houston. So we got to hang out with her and the cat for a couple of days.
It was a good thing I got lots of sewing time during the week. There was enough time to finish all the blocks for Good Fortune (Bonnie Hunter).
Good Fortune was the 2018 BH mystery quilt along. The blue and green were from her color palette, but the red was switched for purple and the orange for black. I'm pretty happy with how it came together. The instructions just sewed the blocks together, I've decided to add some narrow sashing and corner stones to keep the chain moving across the quilt. I'll start up on that today now that I can get back to the sewing room.
Linking up with my normal Monday linky parties, Patchwork & Quilts plus Sew & Tell Monday.
Sunday, July 19, 2026
Stitching Stuff: Week 29 of 2026
Other than PT appointments, I think this last week has been the first one in a bit without a doctors appointment. That won't last, I have a orthopedic appointment this next week and a dentist appointment the following. Thankfully both are in town, so no drive to Tulsa required. I had a couple of really good afternoons of stitching time, so it wasn't hard to get my time in this week.
- 15 minute days/week = 7/7 days
- 15 minute days/July = 18/18 days
- 15 minute days/2026 = 195/199
- Success rate = 97.99%
Tuesday, July 14, 2026
To Do List for the Week of 7/14/2026
Monday, July 13, 2026
A Finished Quilt Top
Sunday, July 12, 2026
Stitching Stuff: Week 28 of 2026
It was a fairly quiet week for a change. I had an endodontist appointment on Monday to check if my tooth problem needed a root canal. Nope, I just have a really bad sinus infection. After round three of antibiotics, I'm hoping that issue is resolved. Other than my PT appointments, I was free to make progress in the sewing room.
- 15 minute days/week = 7/7 days
- 15 minute days/July = 11/11 days
- 15 minute days/2026 = 188/192
- Success rate = 97.92%
| 1. Gretchen 2. maggie fellow 3. Julie in GA | 4. LeeAnna 5. Karen 6. Quilting Gail | 7. Melisa- Pinker n' Punkin Quilting 8. Bonnie in Va 9. Andrée at Quilting & Learning |
Powered by... Mister Linky's Magical Widgets.
Thursday, July 9, 2026
2026 Quilt Making Strategies: Third Quarter Plan
Hard to believe over half of 2026 is already past. The end of the year will come up quickly. So far I've stuck to the main strategy that was posted in January, but the priorities of some of the projects has changed. That's not so bad. The plan for second and third quarters was to focus on moving UFOs to finished, or at least closer to finished. I'm going to stick with that strategy.
1. Guild BOM 2026
The 2026 Guild BOM has to be finished by the November guild meeting. The first draft of the block instructions for the last 4 blocks are written. The plan is to get all the blocks made this quarter and start quilt assembly. I won't be able to complete assembly until October after the last block is shown, but doing all I can this quarter will help keep what needs to get assembled at the end to a minimum.
2. Wild and Goosey. Continue to use two blocks as my leaders and enders. The goal is to have all the blocks done by the end of the year.
3. UFOs to be moved to finished quilt tops.
Lupine and Laughter just needs borders, so that should be a quick finish. Good fortune still needs 7 of the star blocks constructed before assembly can start. I do expect that project to make it to finished quilt top before the end of the quarter. There may be some progress on Celtic Solstice by the end of the quarter. I'm not sure the blue and yellow scrap quilt will see any progress at all. It would be great if I get that far.
4. Walking foot quilting.
I've learned that it takes me a quarter to quilt one project. So the goal for third quarter is to finish quilting Glowing Hearts. If I can make a start on Betty, that would be a really successful quarter.
5. External Quilting
I've changed up the priority of my external quilts. Squared Away is a gift for one of My Girl's college buddies, so it gets moved up to next in line. My Girl has asked for 3 more quilts as graduation gifts for her grad school buddies. I suspect one of the girls will like Magnificent Mystery, so I'm going to bump that one up too.
If I can end the quarter with 2 more finished quilts and 2 more projects moved to finished quilt tops, it will have been a really good quarter.
Wednesday, July 8, 2026
Second Quarter Review 2026: Strategic Progress?
Back in January, I drafted a strategic plan (?) for 2026. Strategic Plan is probably a gross overstatement of what I actually put together, but it was at least a potential road map for my quilting decisions. Now that we are in 3rd quarter, I should probably take a look at where I'm at and decide on any adjustments.
2nd Quarter Strategy
1. Guild BOM: Finish May through October blocks. Finish Flying geese.
The May, June and July blocks are all finished. The flying geese for the alternate border are also all finished. The instructions are written for the August and September blocks. I needed to verify the cutting dimensions for some of the pieces for the October block and that got done last week. So I didn't get everything done, but I'm also not too far off track. If I put focus on this project in July, I should be back on track before we got too far into third quarter.
2. Wild and Goosey: Continue as leaders and enders project
All the blue 3.5" blocks were finished last quarter and most of the blocks were sashed. The hope is this project will be ready for assembly before the end of the year.
3. Move UFOs to finished quilt tops.
Three of the 5 UFOs became finished quilt tops: 2026 SAHRR, Magnificent Mystery and Old Town. Lupine and Laughter only needs two more borders added to be a completed quilt top. The remaining pieces needed to assemble the blocks for Good Fortune have been cut. The chain blocks are all finished, but still working on the star blocks. I didn't get it all done, but at least every project on the plan is farther along.
4. Walking foot quilting
The plan was to finish off two quilts, but only Chilhowie was finished up. Glowing Hearts has been pulled out of the closet, the batting laid out to relax and I've been contemplating quilting motifs. So even though it didn't get done, at least there was a bit of progress on it. Based on how the walking foot quilting has been going, one quilt a quarter seems to be my speed, at least for now.
5. External quilting
A backing was pieced for the 2025 Inverted Star BOM. Both the backing and the quilt top were prepped for quilting. I delivered the project to the long armer the first week in July. So at least that one will be a finished quilt in third quarter. I didn't even touch Chocolate Marshmallow. It's probably going to go to the bottom of the list as My Girl has picked a few quilts that will be going to college and graduate school friends. So those will higher priority the last half of the year.
Second quarter wasn't a total success, but I have learned a lot. I'm doing well at moving projects to finished quilt tops. That will help a lot in clearing out my UFO list. But I'm not doing so hot on either the walking foot quilting or getting quilts ready for external quilting. It seems one quilt top for each a quarter is about my speed on that part of the UFO process. I'll have to consider if that modifies my strategy for third quarter or not. At any rate, there's been reasonable progress on all of my "strategies". Not a bad first half of the year.
Tuesday, July 7, 2026
To Do List for the Week of 7/7/2026
Monday, July 6, 2026
An Interrupted Stitching Week
Sunday, July 5, 2026
Stitching Stuff: Week 27 of 2026
Did you spend last evening watching fireworks? We didn't go this year, it's just way to hot to be outside for long, even after dark. Summer really hit this week, the sewing room has been the place to be.
- 15 minute days/week = 6/7 days
- 15 minute days/June = 28/30 days
- 15 minute days/ July = 4/4 days
- 15 minute days/2026 = 181/185 days
- Success rate = 97.83%
Powered by... Mister Linky's Magical Widgets.
Thursday, July 2, 2026
June PHD Report
Hard to believe we are half way through 2026. By this point you realize your goals were just a touch too ambitious and what seemed doable back in January is probably not going to get done. At least that's how it seems to work for me. Thankfully it is the start of a new month, so another chance to make good progress on my projects. Linking up with Ms. P Designs to review on my progress with my June PHD Report.
June's report includes another finish. It's my second for the year. Which isn't much, but two finishes is double what I had last year. Not what I had hoped to achieve by this point in the year, but I'm not going to be too hard on myself.
Chilhowie, the 2022 Bonnie Hunter Mystery, was finished in June. This is my first attempt at quilting a whole quilt (my March finish was a quilt as you go project). I learned a lot while quilting this project. It's far from perfect, but it doesn't look too bad. The quilt is 61" x 62", a bit bigger then I remembered. This project was donated to the local charity that supports women fleeing domestic violence. I'm hoping this colorful quilt ends up with one of the kids, I think they'd like the bold colors.
Even though there was only one finish this month, there has been good progress on some of my other UFOs.
The embroidered butterfly panel is my travel project. It came along with me on my visit to My Girl the last week of June. I also took my sewing machine. But the days we had plans, it was easier to work in a few minutes of embroidery time then pull out all the sewing stuff. I sew on her dining room table, so it has to get put away when we eat. I made good progress on the 7th butterfly.
I needed a new block assembly project for June. The UFO with the most blocks already completed was Good Fortune, the 2018 Bonnie Hunter Mystery. The chain blocks were a pretty quick finish, the main pinwheel blocks are taking a bit longer.
June was spent adding sashings to the blue Wild and Goosey blocks (Bonnie Hunter). I made good progress with those, but didn't quite get finished. It's much easier to put the blocks up on the design wall now that most of them are sashed. I'm excited to get this project to the assembly stage. Purple and teal still need a number of blocks, but there has been progress on both.
The 2025 Guild BOM is prepped for quilting and will be dropped off for long arm quilting this week. Fingers crossed that means a finish in July.
The July block of the month for the guild was shown at the June meeting. I've been working on the blocks for the rest of the year. Instructions have been written, but that's about it. I need to get going as I'll need to have the August block ready in just a couple of weeks.
The blocks for Lupine and Laughter (Bonnie Hunter's 2025 mystery) were finished last month and assembled into a top. The first border is on. The strips for the last two borders are cute. Those should go on in July.
Looking back, there was visible progress last month on my project tracking chart.
There was a finish, another quilt that reached the ready to be quilted stage, and another quilt to adding borders stage. There has been steady progress in the first half of the year. Hopefully I can keep up the momentum into July.

































