Tuesday, November 17, 2026

To Do List for the Week of 11/17/2026

I didn't realize how resistant my brain was to it being November. When reviewing last week's post, I realized that all my dates started with 10, not 11.  The post title was 10/10, the header for the list for the previous week was 10/2 and the header for last week was 10/10. The post has been updated to show the correct dates.  I did the same thing for the to do list for 11/03, the title originally had 10/03. Obviously, I was in deep denial about it being a new month.   

Having said that, November hasn't been bad on the progress front. 


To Do List for 11/10/2026

1.  2027 Guild BOM: Work out instructions for setting blocks ✔
2.  Betty: Prep back for quilting, cut batting ✔
3.  Celtic Solstice: Work on Pieced borders ✔
4.  Marigold Mystery: Finish Oct, start Nov blocks ✔
5.  Wild and Goosey: Continue making purple blocks ✔


Definitely a good week on the progress front. Hopefully that carries over to this week.  

To Do List for 11/17/2026

1. 2027 Guild BOM: Start drafting setting and Jan block instructions

Next year's BOM will need a number of setting blocks for the quilt I've designed (actually redesigned yesterday after I realized that you couldn't make the original setting blocks without paper piecing them). The rule for the guild BOM is no special techniques or specialty rulers should be used. Thankfully the redesign wasn't too bad. I don't like it as well, but rules are rules. The design and yardage requirements have to go out at this month's meeting. I have that ready, just need to print a few copies to pass around. 

2. Betty (Meadow Mist Designs): Sandwich quilt, select thread




The top and back are prepped, the batting cut to size.  Now I just need to press and pin the sandwich together.  I'm still playing with how I'm going to quilt it.  That will decide if I only need one thread or several.  

3. Marigold Mystery (Meadow Mist Designs): Work on November blocks



  
All the October blocks are made. Those are the last 3 columns in the photo.  I've started on the November clue of creating spool blocks from the sawtooth star blocks.  I didn't finish cutting all the pieces needed to create all the spool blocks for this month, so that's on the list for this week too.  

4. Wild and Goosey (Bonnie Hunter): Work on purple blocks

Now that Celtic Solstice is a finished quilt top, Wild and Goosey becomes my "older" focus project.  The plan is to finish the paper pieced blocks, plus add the sashing to create the larger blocks.  The goal is to have all the sashed blocks made before the end of the year so quilt assembly can start next year.  

5. Simply Sensational Summer Scrap Quilt (Kevin the Quilter): Work in as leaders and enders project




I've not worked on this project since last July.  It's the only project that was on my "assemble blocks" project list for 2026 that I've not touched this year.  I'll be happy with if any progress happens with this before the end of the year.  

So that's my list for this week.  We'll see how much progress I make before I have to really start putting things aside and concentrate on Thanksgiving.  Linking up with the Quilt Schmilt for To Do Tuesday. 

Monday, November 16, 2026

Finishing Up and Getting Ready

I'm not ready for Thanksgiving and definitely struggling to even start addressing what needs to get done before Christmas.  I'd so much rather spend time in my sewing room. But it is getting to that time of the year where you have to decide what you are really going to get done in and out of the sewing room.  My highest sewing room priority has been to get Celtic Solstice to finished quilt top. 





The pieced borders have been added. The plan is to add one more border of the dark brown.  Celtic Solstice is the last Bonnie Hunter mystery quilt that's not made it to at least a finished quilt top.  Once that last border is added it will join the other five BH mystery quilt tops hanging in the to be quilted closet. Another eight are completely finished, all of them gifted or donated. I'm looking forward not having any BH mysteries sitting in my project boxes.     

Celtic Solstice is the finishing up part of the post.  The getting ready part is of course the fabric selection for the next Bonnie Hunter mystery, Star of Maghrib. 




The only color I kept out of Bonnie's palette is the sapphire blue.  The amethyst is my red, aquamarine is my green. I found a pale purple/lavender to use as the background.  The purple is the only fabric I'm going scrappy with.  I'm looking forward to playing with these colors.  

Linking up with Patchwork & Quilts, as well as, Sew & Tell Monday.   

Sunday, November 15, 2026

Stitching Stuff: Week 46 of 2026

 


It got cold enough Friday night that we decided it was time to turn on the heat.  It was 24 F outside when we got up this morning and 66 in the house.  Definitely sweater and lap quilt time here.  Our days have been sunny, so my sewing room on the west end of the house has been pretty toasty, especially with the iron on. So getting my stitching time in hasn't been a hardship. 

  • 15 minute days/week = 7/7 days
  • 15 minute days/Nov = 14/14 days
  • 15 minute days/2026 = 311/318 days
  • Success rate = 97.80%

It will get harder to keep up the stitching time as the holidays get closer.  Even being retired, there is a lot of other stuff that has to get done.  I suspect I'll be doing a lot more handwork between now and the end of the year to keep up my stitching time. 

Have you gotten more stitching time in with the cooler temps?  

1. Julie in GA
2. Melissa G
3. maggief
4. Frédérique
5. Karen
6. Quilting Gail
7. Bonnie in Va
8. Patricia in New Mexico

Powered by... Mister Linky's Magical Widgets.

Tuesday, November 10, 2026

To Do List for the Week of 11/10/2026

Last week went fast!  I always feel like time speeds up this time of year.  Maybe it's the shorter days? At any rate, it's been much easier to spend time in my sewing room this last week.  It's still warmer than the rest of the house, but as cool as it's been, that felt good.  I can't say I made short work of my to do list, there was good progress on some things and not so much progress on others.  

To Do List for 11/2/2026

1.  2026 Guild BOM: Finish borders ✔
2.  Glowing Hearts: Make label and binding ✔
3.  Marigold Mystery: Finish October blocks - progress 
4.  Celtic Solstice: Continue assembling pieced borders ✔
5.  Wild and Goosey: Continue making purple blocks ✔

I went a little off script last week. Once I had the binding and the label for Glowing Hearts, it just made sense to get that quilt finished.  I posted about it yesterday.  So that project will come off the to do list.  The 2026 Guild BOM is now a finished quilt top, so it comes off the list too, at least for now.  I didn't get as far with the Marigold Mystery as planned, but I'm not unhappy with what got done last week.  Two projects off, but there are two new projects to take their place this week.  

To Do List for 11/10/2026

1.  2027 Guild BOM: Work out instructions for setting blocks. 

I need to work out the construction instructions for the setting blocks. How the setting blocks are constructed will affect the fabric needed, so that needs to get worked out pretty soon as fabric requirements for next year's BOM go out at the November guild meeting. I may need to tweak my own fabric pull before starting the blocks.  

2. Betty (Meadow Mist Designs): Prep back for quilting, cut batting





This is where I went off script last week. Wednesday and Thursday are my walking foot quilting days. With Glowing Hearts winding down, I needed a new project to quilt. Betty was next on my list. I pieced the backing and laid out the batting so maybe some of the wrinkles would relax.  The backing needs a good pressing before I cut and lay the batting over it. Then it will be time to give the top a final press and deal with any loose threads. I may get that far this week, we'll see.  

3.  Celtic Solstice (Bonnie Hunter): Continue working on pieced borders





The side borders are assembled and are stitched to the quilt top. The last two borders are under construction at the sewing machine. I'm adding one more narrow border after the pieced border.  I'm pretty sure I'll get the pieced borders done, not sure about getting the last one added before next week.  

4.  Marigold Mystery (Meadow Mist Designs): Finish Oct, start Nov blocks





These may be a bit bold, but aren't they fun?  I've made good progress on the October blocks.  Those should definitely get done this week.  If I can get the fabrics cut for the November clue this week, I'll be happy.  

5.  Wild and Goosey (Bonnie Hunter): Continue making purple blocks

This has been my leaders project for the past couple of years. Which means I've made steady progress all year. I'd like to have all the blocks done so I can start assembling the quilt next year.  Once Celtic Solstice is a quilt top, I'm going to bump this project up in priority so I can get the blocks finished and sashed before the end of the year. That means I need a new leaders and enders project. 

That's my list for this week. It may be a bit ambitious, so I'll have to be gentle with myself if I don't get it all done. Dream big right?  Linking up with the Quilt Schmilt for To Do Tuesday.  

Monday, November 9, 2026

The Fifth Finish!

Oklahoma has finally started it's autumn.  It's cool enough to need jackets, at least in the morning and evenings. We went out Saturday evening and it was really cool. It was so warm for so long that this cooler, need a jacket weather feels really weird.  

It was a good weekend to sit in the sewing room with a quilt over your lap. So I took the opportunity to sew the binding to the back of Glowing Hearts. 




Glowing Hearts was started in May of 2025. This pattern was Sandra Walker's, MMM Quilts, quilt along that year.  This was the first time participating in one of Sandra's quilt alongs. I really enjoyed it. Sandra's version only had 9 hearts, I added another 3 to end up with a rectangular quilt. The hearts are made from a half yard bundle I won someplace.  No idea on the fabric line or where it's from.  The teal and yellow background is from Wilmington Prints, called Falling Leaves.  Both the half yard bundle and the background have been in the stash for a while, it was nice to find a project to use them up. 

 



Use them up I did. What didn't make into the blocks got used on the pieced back.  




The quilting was done with my walking foot.  The 1" grids in the hearts took forever, but they turned out pretty well.  I had planned to donate this quilt, but with all the quilting I did, I'm keeping this one in the closet as a potential gift. It's 46" x 55", so it would make a good baby quilt or lap quilt for someone.  



I added a small label to the back and changed the name. The inspiration was Janis Joplin's song "Piece of My Heart".  It's definitely a classic.  I'll admit that song kept playing in my head while I was making the label. 

Pieces of My Hearts will probably be my last finish for 2026.  I've started prepping another quilt for the walking foot. The batting is laying on the bed in hopes some of the wrinkles will soften a bit and the backing got made. We'll see how far I get on it before the end of the year. I'm still contemplating how I'm going to quilt it, but definitely not doing as much as I did on this quilt. So maybe I'll have one more finish this year? 

Linking up with Patchwork & Quilts, as well as, Sew & Tell Monday and I Quilted This.  I'll link up with Quilting Jetgirl for My Favorite Quilt Finish once it's posted at the end of the month.  

Sunday, November 8, 2026

Stitching Stuff: Week 45 of 2026

 


How are you adjusting to the time change?  The early sunset seems to have sapped my evening energy.  But that's not new. I started the 15 minute stitching time challenge because I remember driving home in the dark after work and just having no energy to carry me to the sewing room.  It was easier in the summer. I must be at least partially solar powered.  Now that I'm retired it's not so bad as I can get into my sewing room before it gets dark.  So it's no surprise that time change didn't play too much havoc with my sewing time.  


  • 15 minute days/week = 7/7 days
  • 15 minute days/Nov = 7/7 days
  • 15 minute days/2026 = 304/311 days
  • Success rate = 97.75%


It was another good week on the stitching front. I never manage to make as much progress on my to do list as I think I will. Thankfully I still have some time to work on what I haven't gotten to this week. 

How are you doing at getting in some sewing time each week?  


1. Gretchen
2. maggief
3. Julie in GA
4. Melissa G
5. Karen
6. Frédérique
7. Andrée at Quilting & Learning
8. Bonnie in Va
9. Quilting Gail

Powered by... Mister Linky's Magical Widgets.

Wednesday, November 4, 2026

October PHD Report

October ended with a rainy day, very autumn like weather.  Something we didn't get much of till after mid-month.  It really seemed like we had an endless summer, so I find myself very surprised to be in November and realizing there are just 2 months left in the year.  

With the start of a new month, it's time to review what actually got done the previous month.  So it's time for the October PHD Report sponsored by Ms. P Designs.  My October report has a finish on it. 





My 4th finish, Squared Away (SoScrappy) was started in 2018 as part of the Rainbow Scrap Challenge sew along that year.  It took me forever to figure out what do do with the blocks.  I'm happy with how it came together. It's a gift for one of My Girl's college buddies.  




 In addition to the finish this month, progress was made on several other projects.  Celtic Solstice, the 2013 Bonnie Hunter mystery quilt, has moved from an incomplete set of blocks in August to quilt top just needing the final two borders.





Wild and Goosey (Bonnie Hunter) was started in 2019 as another Rainbow Scrap Challenge project.  I've been working on these blocks steadily for about 3 years now as my leaders project.  The teal blocks are all sashed.  That just leaves me to finish all the purple blocks and sash those. I may have to bump these blocks up to a priority project to get all the blocks finished by the end of the year.  





Glowing Hearts (Sandra Walker) is quilted. It just needs to be trimmed, a label made and bound.  This project will probably be my last finish for 2026. 






The 2026 Guild Block of the Month project is coming to an end.  The instructions for quilt assembly go to the guild in November.  I gave everyone the December block back in January as it was a lot of flying geese.  One of the flying geese borders was on by the end of October.  There's been more progress since then. 




All the September blocks are finally finished for the Marigold Mystery (Meadow Mist Designs).  Just in time for the November clue to come out. All the pieces for the October blocks were cut before the end of the month. I've finished some of the October blocks since, but I'll still be playing catch up in November. 




  
The progress graph shows a lot more color in the middle section, but there are also lots more bars that go all the way across the chart in the top section. 




I'm hoping to add a bit more color before the end of the year. At least one more finish and hopefully at least two more projects to finished quilt top.  This year has definitely been better than last year in terms of finished quilts. I'll take that.  

Tuesday, November 3, 2026

To Do List for the Week of 11/2/2026

Just a bit under 2 months left in 2026.  It's the time of year that if you haven't reached your goals, you have to decide what part of them can you actually make progress with.  The holidays will be busy with the seasonal stuff we do with and for our families.  I'm trying to keep an attitude of what gets done, gets done, what doesn't can wait till next year.  

That last week in October went way too fast, but I still did really well at working through what was on my to do list.  

To Do List for 10/27/2026

1. 2026 Guild BOM: Work on assembly ✔

2. Glowing Hearts: Finish quilting borders ✔

3. Marigold Mystery: Finish Sept, start Oct blocks ✔

4. Celtic Solstice: Continue making blocks for pieced border ✔

5. Wild and Goosey: Continue making purple blocks ✔

It's been a while since I've managed to check off everything on my list.  You have to go back to August for the last fully checked off list.  So it was definitely a good week. I'm hoping for another good week.  I'm close to finishing one quilt and getting two other projects to finished quilt tops. 


To Do List for 11/03/2026

1. 2026 Guild BOM: Finish borders





The pieced borders have been added to the top and bottom.  The narrow purple border has been added. All that's left is the dark blue border.  So this should become a finished quilt top before the end of the week.  Once this is ready for this month's guild meeting, the BOM for next year will be my priority.  

2. Glowing Hearts (Sandra Walker): Make label and binding




I've got a start on the label. It definitely needs more work, but it's getting there.  Hopefully I can get the quilt sandwich trimmed this week too.    

3. Marigold Mystery (Meadow Mist Designs): Finish Oct blocks





All the square in a square blocks are finished and I've gotten started on the uneven 9 patch blocks for October.  Hopefully I can get caught up this week, because the November clue comes out this Thursday.   

4. Celtic Solstice (Bonnie Hunter): Continue assembling pieced borders



 
I finished making the triangle in a square blocks last weekend, there were only 4 left when I sat down at the machine on Sunday.  The first pieced border is almost assembled. I'll focus more on this project once the guild BOM is a completed quilt top.  

5. Wild and Goosey (Bonnie Hunter):  Continue making purple blocks

Not sure how many are left to make, probably around 12.  The goal is to get the 3" purple blocks made this month and get them all sashed next month.  The project will probably have to move up in priority to make that happen.    

That's my list for this week.  Linking up with the Quilt Schmilt for To Do Tuesday.  

Monday, November 2, 2026

The Quilting Part

The first day of November was overcast and chilly.  Not cold, just chilly enough to want a sweater most of the morning. Today looks to be much the same, though based on the forecast we have a chance of severe storms this evening.  Definitely a day to get my sewing machine time in during the afternoon. 

I spent part of my sewing time yesterday getting end of the month photos of where all my projects are.  I was finally able to get a full on shot of the completely quilted Glowing Hearts (Sandra Walker).  




I haven't taken the time to trim off the excess batting, that should happen this week. It is hard to see the quilting unless you blow up the picture a bit.  I decided to quilt just a couple of sets of double lines in the border, like a frame. It's pretty similar to what I did in the sashing, though that was single lines.  I also basted around the outside edge to make trimming and adding the binding a bit easier. The border was quilted with teal thread. I considered using the same yellow I used in the blocks, but just liked the teal better.  




I've started making the label. After consultation with My Girl, we took inspiration from an old Janis Joplin song and decided to call my version "Pieces of My Hearts".  The binding still needs to be cut and sewn. The same dark blue used in the sashing will be the binding. This should be close to finished by the end of the week.  

This is the third quilt I've used my walking foot to quilt.  I learned a few tricks with this one that should make the next one go a bit faster.  Linking up with Patchwork & Quilts, as well as, Sew & Tell Monday.  

Sunday, November 1, 2026

Stitching Stuff: Week 44 of 2026


 

Halloween and time change on the same night doesn't seem fair, even if we do gain an hour of sleep.  Maybe the little ones with sugar over doses before bed will sleep them off with that extra hour, but I doubt it.  It will take us a few weeks to reset our internal clocks.  It's also the first day of November.  Which I'm equally not prepared to acknowledge.  So let's dwell on last week shall we? 


  • 15 minute days/week = 7/7 days
  • 15 minute days/Oct = 30/31 days
  • 15 minute days/2026 = 297/304
  • Success rate = 97.70%


There was a lot of progress in October, even with me missing one day.  It may not be as good this month and next with the holidays. I'm OK with that.  I'll still make some progress, but it's easy to temper expectations around the holidays.  To many other things to get done.  I'm hoping to keep my success rate above 90, but we'll see how that goes.  

How are you doing on your 2026 goals.  Will you reach them this month or have you given up on most of them as lost causes?  


1. Julie in GA
2. Melissa G
3. maggief
4. Karen
5. Frédérique
6. Deb in Canada
7. Andrée at Quilting & Learning
8. Melisa- Pinker n' Punkin Quilting
9. Jennifer in Indy
10. Bonnie in Va
11. Quilting Gail

Powered by... Mister Linky's Magical Widgets.