We've had the hottest temps of the year this week. The heat index yesterday was 120 F. My Guy was going to go ride, but that's too warm even for him. I've mostly been hanging out in the sewing room. It's been so warm the upstairs air conditioner is having problems keeping up, we've raised the thermostat a bit so it's not running constantly. Which means the sewing room has been a bit warm, but with the ceiling fan on it's still inhabitable. Consequently I made good progress on last week's to do list.
To do List for 8/15/2023
1. Unity: Finish packaging, take to post office ✔
2. Wild and Goosey: Make 2 yellow blocks - no progress
3. Melodic Mystery: Finish assembly, start borders ✔
4. Scrappy Butterflies: Continue making alternate blocks ✔
5. Chilhowie: Continue as leaders and enders ✔
Four check marks out of five is a good week. I just spaced off the Wild and Goosey blocks this week. I was having fun playing with the new additions to the WIP list that I just forgot to make them. Hopefully I can do better with this week's list.
To Do List for 8/22/2023
1. Macaron Mystery (Meadow Mist Designs): Start assembling backing
There were a lot of left over subunits for this project because I changed the final layout and didn't need all the blocks. The left overs are going to be added as two rows to the back of the quilt. I showed the backing fabric in yesterday's post. I can get the width I need out of it, but not the length. So in addition to the pieced rows of left overs, I'll need to make top and bottom filler rows from some of the left over yardage.
2. Scrappy Butterflies (self designed): Continue making alternate blocks
Three alternate blocks were added to the design wall this week. Another 3 are under construction at the sewing machine. The next step will to be start on the blocks for the pieced border. I may get that far this week, but maybe not. We have plans for the weekend, so I won't get in as much stitching time as normal. Finishing all the alternate blocks would be good progress.
3. Wild & Goosey (Bonnie Hunter): Make 2 yellow blocks
Hopefully I won't forget to make those this week. I just need 5 more yellow blocks to finish out what's needed of that color.
4. Chilhowie (Bonnie Hunter): Continue as leaders and enders project.
Block 6 is finished and block 7 has been started. This has been a good leaders and enders project. It's slow going, but some progress is better than no progress. I'm really hoping to have all the blocks done and the top assembled before Bonnie's next mystery starts up in November.
I'm down to just four items on my to do list for this week. The plan is try to keep it at that level and focus on moving finished quilt tops to finished before the end of the year. Linking up with The Quilt Schmilt: For the Love of Fabric for To Do Tuesday.