Tuesday, December 3, 2019

To Do Tuesday - The Last Challenging Work Week of 2019

One work day done, three work days left in this week. And all three are jam packed, including a working dinner on Wednesday evening.  Hopefully life will slow down a bit next week.  No work days last week, but with family in town and prep for the holiday, sewing room time was minimal. Even so there are two check marks and progress on the last two items on last week's list.  

Weekly To Do List for 11/26/2019
1. Medallion Butterfly Panel - Stitch Butterfly names in upper left corner of panel✔
2. Frolic - Get started on clue 1✔
3. Mosaic Mystery quilt - finish November's clue - progress
4. Winter quilt along - Finish clue 2 and clue 3 - progress


This seems to be my "to do" list pattern, a couple of check marks and progress on the other items.  If I can keep that up, I'll be happy.   So what goes on this list's week?  

Weekly To Do List for 12/2/2019

1. Twinkle Stars - Add last two borders.  



2. Frolic - Start clue 2, make progress on clue 1

Frolic
Bonnie Hunter 2019 Mystery Quilt 


3. Mosaic Mystery - Finish November's clue


  Mosaic Mystery Quilt
from Cheryl at Meadow Mist Designs


4. Winter Quilt Along - Finish Clues 2, 3 and 4. 


 Quiltgirl Winter Quilt Along
Alycia Quilts

That's a pretty aggressive list. I'm hoping there's one day of nothing but sewing this weekend.  If I can make progress on each one even with no check marks, I'll be happy.

Linking up with Home Sewn by Us for To Do Tuesday.   

Monday, December 2, 2019

Bits and Pieces Part 2

After having a fun week off to spend with family, I'm not ready to head back to work this morning.  But once I get through this week, things should calm down for the rest of the year (fingers crossed that's actually true).  Though I expect this week to be pretty rough with a number of long days.  

There wasn't a lot of sewing room time even though I was off work. There was lots of prep work that went along with all the family time.  But I did get in some time with the embroidery project. 



The wording around the right corner of the project is now done. I'll start working on the diagonal moving to the left.  The next bit in the hoop will be the leaves there in the corner.  

I wasn't able to get back into the sewing room till after dinner on Saturday. Making a start on the first clue from Bonnie Hunter's Frolic was the goal.  I wasn't completely happy with my "raspberry" fabric. After taking another look through the stash, I found a substitute, but it needed to be washed, dried and pressed first.  That out of the way, I was able to get in a few 4-patches Sunday afternoon.


Frolic
Bonnie Hunter 2019 Mystery Quilt 

I should have some time to catch up next weekend. I decided to half the number of blocks to start.  I'm hoping that means it will be easier to keep up with the clues this year. 

Lastly, there was some progress on clue 3 for the Winter Quilt Along.  


 Quiltgirl Winter Quilt Along
Alycia Quilts

Not all the blocks in each row are sewn together, but at least I got a good start on assembly.  Clue 2 hasn't been finished yet, but I reached the halfway point with that clue. 

Not bad for a week away from the sewing machine.  Linking up with the Monday Design Wall.  

Sunday, December 1, 2019

Week 48: Stitching Stuff

We've eaten and shopped pretty much the whole weekend.  Family is gone, so it's back to just us.  It was a very nice Thanksgiving, but now I'm just tired.  The SIT goes back to college this afternoon, but she'll be home for winter break in just two weeks.  Stitching happened this week, mainly just the hand type, but that still counts. 




15 minute days/week = 7/7 days
15 minute days/November = 29/30 days
15 minute days/2019 = 302/334 days
Success rate = 90.42%

It was a good week. Hopefully you found a bit of quiet time this week to stitch a bit each day.  You can link up at the bottom of the post to share your success and/or regrets for this week.

On the stash front, November was better than October. 

Fabric out for November = 3.11 yards
Fabric out for 2019 = 41.03 yards  

I was hoping for 60 yards out.  Not likely I'll make that goal this year.  But as I start assembling some of the blocks for the mystery quilts, there should be a bit more out in December.  Linking up with QuiltPaintCreate for the weekly stash report. 

Before I close out with the linkly, here's a few shots of the pretty Christmas lights we braved the cold and rain to check out last night. 




So how did your stitchy week work out?  



1. karen
2. Chrisknits
3. Julie in GA
4. Meloney
5. Quilting Gail
6. Mary-Kay
7. Amanda
8. Christina's Handicrafts

Powered by... Mister Linky's Magical Widgets.

Friday, November 29, 2019

Wrapping up November

Hope everyone in the US had a wonderful Thanksgiving.  We had 22 here for dinner. We split the cooking duties with My Guy's youngest sister, she does the turkey, the Scientist in Training does the ham.  Allows us to have two ovens going all morning, which makes a huge dent in how much has to get done in one kitchen.  It was nice to catch up with everybody, see how big all the little ones are getting. 

Thanksgiving was about as late as it can be this year.  So with just a couple of days left in the month, it's time to post about the November One Monthly Goal


The plan was to finish the pieced border and add a plain white border to Twinkle Stars. 

Twinkle Stars
Tutorial by Andrea Feldbush of Soscrappy


Both borders were on with time to spare this month for a change. First time since July that I've met my OMG. So it was a good month, in spite of all the madness going on at work. The only problem is that I don't think Twinkle Stars looks finished.  I waited till the SIT got home for the holiday to see if she agrees.  She did.  She also agreed it needed to be a bit longer as the intended recipient is very tall. The only problem is that this was supposed to be a Christmas gift.  If I add more borders it won't get done in time.  So the SIT and I are still talking about the path forward. Hopefully, we'll have one by the time she heads back to school on Sunday. 

The other progress for the month has been on clue 3 for the Mosaic Mystery quilt. 

Mosaic Mystery Quilt
from Cheryl at Meadow Mist Designs

I switched a couple of fabrics once the mystery got started and now I'm thinking that probably wasn't a good idea.  We'll see how it looks at the reveal.  Clue 4 is due out next Thursday. Clue 1 for Bonnie Hunter's Mystery, Frolic, came out today.  I'll have lots to keep me busy in December.  Lots of options for the December One Monthly Goal.