Wednesday, June 3, 2026

May 2026 PHD Report

May went fast. Hard to believe that at the end of this month we'll be half way through 2026.  Looking back, May was a pretty productive month, even though my PHD report didn't change.  





I'm still going to link up with Ms P Designs for the May PHD report to show that no finish isn't the same as no progress.  





The goal for 2nd and 3rd quarter this year is to tackle my UFO pile.  Good Fortune was the 2018 Bonnie Hunter mystery. The project box had a pile of both A and B blocks, with a few other odds and ends from the various steps.  The A and B blocks will go into one quilt, the blocks that were supposed to be the pieced borders will either get worked into the quilt back, or into a separate quilt top.  The total number of blocks has been decided and all the pieces to make those blocks have been cut.  Probably won't make any additional progress on this project till this year's BH mystery is a finished quilt top. 





Progress on Wild and Goosey (Bonnie Hunter) has been slow since sashing the blue blocks has been my leaders and enders project for most of May. Slowly, but surely more 7" blocks are showing up on the design wall.  



Chilhowie, the 2022 Bonnie Hunter Mystery, was the next project on my "to be quilted" list.  Still need to add the second set of cross hatch lines to the left side of the quilt. I've figured out how to feed the quilt to the machine without dragging, so the stitching has been much more even on the more recent quilting lines.   





The 2024 Bonnie Hunter Mystery, Old Town, just needed the borders added. It's now a finished quilt top hanging in the closet with all the other to be quilted projects.  




Some quilts on the to be quilted list will be quilted professionally. the 2025 Guild BOM is one of those.  The backing was ready for stitching at the end of the month. So didn't quite get this step done in May. 
 



The Meadow Mist Designs 2025 Magnificent Mystery quilt also just needed a final border.  It's hanging right next to Old Town waiting to be quilted.  




The June block was added to the 2026 Guild BOM this month.  The July block is actually finished, but hasn't been shown to the guild yet.  The plan for June is to at least start on the August, September, October and November blocks and start on the instructions. 





Lupine and Laughter (2025 BH Mystery) was the project with the most progress this month.  All the alternate blocks are made.  The main block takes lots of stitching time, so it's been slow going, but there has at least been some progress with those.  





My progress chart isn't much different from April. Two projects have graduated to finished quilt tops, but that's about it for May.  Hopefully June will see at least one more finished quilt top and a finished quilt.  Cross your fingers for me.  

No comments: