Showing posts with label Red. Show all posts
Showing posts with label Red. Show all posts

Saturday, April 13, 2019

2019 Finish Along: Second Quarter Ambitions

We are already at the end of the second week in April,  almost half way through the first month of the second quarter.  The linky party for the Second Quarter 2019 Finish Along is up and running.



So it's time to focus on what might become a finish before the end of the quarter.  Back in December of last year, I put together a list of quilts to finish up in 2019.  So far only one quilt has come off the list, but I'm close too finishes on the next two.  So those will definitely go on the list for second quarter.

1.  Christmas Mystery Quilt (Ho Ho Ho) - Just needs the binding sewn to the back.  

Ho Ho Ho (Christmas Mystery)
designed by Carrie Randall (Quilter's Hideaway)

2.  Christmas Angels - Ready to be sent out for quilting

Christmas Angels
Pattern by Kate


The last three quilts all need quite a bit of work.  I doubt all three will get finished this quarter, but they'll go on the list in hopes I'm really, really motivated the next couple of months. 

3.  Vintage Dresses - Needs borders, backing, prepping, quilting and binding. 

 Vintage Dresses by dress blocks by Charise Randell, setting by Kate

4.  Red, White and Blue Stars - Blocks done.  Needs sashing and broders, backing, prepping, quilting and binding.

White and Blue Stars
Setting by Kate

5.  Twinkle Stars - Needs assembly, backing, prepping, quilting and binding.

Twinkle Stars
Tutorial by Andrea Feldbush of Soscrappy
  

Being realistic, the first three quilts on the list should make it to completion this quarter.  I really hope to make really good progress on number 4, but doubt that number 5 progresses any this quarter. 

Linking up with the 2019 Second Quarter Quilt Along post.  Wishing you a fun, productive and quilty second quarter.  

Wednesday, April 11, 2018

2018 Finish Along - Second Quarter Projects

This year is supposed to be all about finishing up a few UFOs.  My plan was drafted back in December, twelve finishes for 2018.  I was so optimistic linking up with the first quarter of the 2018 Finish-A-Long, there were 4 quilts on my list.  



But here it is the second week of the second quarter and there are no finishes from my list.  😢   It's not that nothing happened, all the projects have been moved along, just not to the finish line. So looking at what's on the list and what's doable this quarter based on what I know is scheduled at work and home, here's the list for this quarter.  

1.  Geek Chic (Chain Reaction), from the first quarter list. 


This quilt is partially bound and will definitely be finished before the end of April. So unlike last quarter, there will be at least one finish this quarter. 


2.  Magnolia Mystery, from the first quarter list

  Magnolia Mystery by Cheryl Brickey of Meadow Mist Designs

The backing is made, the quilt just needs to be prepped for quilting, packed up and sent out for quilting.  I need a weekend for that and March was very shy on free weekends for quilting.  Hopefully April will be better on that front.  This one should get done this quarter.


3.  EnProvence (French Cherry Blossums), from the first quarter list

 En Provence, A Bonnie Hunter Mystery (2016)

This is my April UFO.  It was on last quarter's list as all that was needed was the backing and I had hoped to fit that in somewhere. Didn't happen.  But now the backing is made and plans are to prep it for quilting this weekend, package it up and send it out for quilting next week.  This one should also get finished this quarter.  


4.  Vintage Dresses, from the first quarter list

 Vintage Dresses blocks by Charise Randell, Setting by Kate

This project was my March UFO.  Due to business travel, spring break and several nights where I had homework, this just didn't make it to finished top. The plan was to give this as a graduation quilt. Not sure I can finish it by May, but hopefully I can finish it off this quarter. 


5.  Christmas Angels

 Christmas Angels  Pattern by Kate

This is the last picture of it's status, but I'm pretty sure all the blocks are made, the quilt just needs to be set together, backing made and then sent out for quilting.  Hopefully all that happens in time for me to get it bound before the quarter ends.  


6.  Red, White and Blue Stars

  Red, White and Blue Stars, Setting by Kate


This is my oldest UFO, from 2005.  I still need to make a few more star blocks, plus the alternating blocks.  I doubt this one gets done, but I'll add it on as my stretch goal for the quarter.  

There are some easy finishes on my list and some I'll be really challenged to get finished this quarter.  But even if I don't get things finished progress will be made and that counts for a lot.    

Good luck with your finishing plans for second quarter.  I'm linking up with the 2018 Finish-A-Long over at She Can Quilt.