Monday, June 7, 2021

Getting Back on Track

The two day weekend went really quickly.  The Scientist in Training was home, but had a wedding to attend and a sleep over with the high school buddies, so we didn't see much of her.  Between errands and a nasty sinus headache, I didn't get in  as much sewing time as I would have liked.  I turned the first corner on stitching down the binding on Grassy Creek. 



I had hoped to have a finish this weekend, but I didn't get in much stitching time during the week.  I'm hoping for more progress on that front this week. 

Row three of the Cabin quilt is done. 

Cabins and Fans, self designed


The first two blocks for row four are in progress.  I had to stop and cut more sashing strips. The plan is to get row 3 sashed to the rest and get a good bit done on assembling row 4.  

Linking up with Monday Making and Monday Design Wall.  Enjoy your stitching time this week.  

Sunday, June 6, 2021

Stitching Time: Week 23 of 2021


After vacation and a three day holiday weekend, this weekend seems really short.  Is it really Sunday already?  Last week went fast. But it was a much better week on the stitching front than I've been having.

  • 15 minute days/week = 7/7 days
  • 15 minute days/May = 18/31 days
  • 15 minute days/June = 5/5 days
  • 15 minute days/2021 = 133/156 days
  • Success rate = 85.26% 
It's been a few weeks since I've managed to stitch each day of a week. Most of those days it really was only 15 minutes, but I at least got those in.  I'm hoping work finally calms down a bit this week and my work days get a good bit shorter.   

How did your stitchy week work out?

1. Julie in GA
2. maggie f
3. Ivani
4. DonnaleeQ
5. Meloney
6. Sherrie
7. Jennifer in Indy
8. DawnyK
9. Quilting Gail
10. Amanda
11. Andree at Quilting & Learning
12. Shasta @ High Road
13. Carol @Quilt Schmilt

Powered by... Mister Linky's Magical Widgets.

Friday, June 4, 2021

June One Monthly Goal

It's so hard to believe it's June already and that the year is just about half over.  There has been some good progress on my UFOs, but just one finish so far. I'm hoping that all the work will pay off in lots of finishes the second half of the year.  I've been playing along with Elm Street Quilts One Monthly Goal for several years, it's the one goal I have met each month this year. 


 So I'm definitely going to set a goal for this month.  I'm close to the second quilt finish for 2021. 



I've started stitching down the binding on Grassy Creek.  I'm close to turning the first corner.  So this is definitely a doable goal.  Maybe I should be more ambitious, but work has been crazy busy, so I'm going to go easy on the expectations for sewing room progress.  

Linking up with the June One Monthly Goal.  Good luck with your stitching plans for the month.  

Wednesday, June 2, 2021

PHD Progress

The plan for this year was to finish a lot of quilts. Participating in Quilting Gails 2021 PHD (projects half done) is supposed to help me with that goal.  


May was a definitely lacking in stitching time, so my PHD report doesn't show a new finish yet. 



The biggest success so far this year is that I've not started anything new.  I do have some planned starts later in the year, but so far I've avoided the squirrels.  The only change to the list was the addition of another project to this year's UFO list.  I don't expect to finish it this year, but making progress counts for something too.  In spite of the lack of stitching time last month, there was visible progress on all the current projects.  

Grassy Creek has the binding sewn to the front and is prepped for the hand stitching to the back.  


I've got a whole month to get that binding stitched down by hand. Finish number 2 should show up on the report next month.  

There wasn't much progress on the Morewood Mystery.


Just two white border strips were added this month. Not much, but it's still progress. 

Row two of Cabin and Fans was completed and sewn to row 1. 


Good progress was also made on getting row 3 assembled. There was a bit of un-sewing and rearranging of row 2 to adjust the order of the different colors.  So there was more stitching on this project then it first appears. 

Construction progressed just a little bit on the third Step 7 border for Unity. 


Just four more blocks needed to finish off that third border.  

The newest project added to the 2021 rotation is an embroidered panel that will eventually become the center of a medallion quilt. 


This is my travel project. I made a good bit of progress on that 5th butterfly while we were on vacation.  

Though it wasn't the month I was hoping for, there was still really progress on each project.  Some months that's as good as it gets.  

Linking up with the May PHD Report over at Quilting Gail's

Tuesday, June 1, 2021

To Do Tuesday for 6/1/2021

We had a relaxing holiday weekend.  We didn't go anyplace, we just hung out around the house. Consequently I was able to spend some quality time in my sewing room for the first time in weeks.  May wasn't the best month for stitching. My last To Do Tuesday post was almost a month ago.  My stitching time was just so limited that I haven't bothered to make up a list since. So we'll start from where I left off and just move on from there. 

Weekly (Monthly?) To Do List for 05/04/2021

  • Grassy Creek: Make label and binding ✔
  • Morewood Mystery: Work on border 3 ✔ 
  • Cabins and Fans: Assemble Row 3
  • Unity: Make HSTs for clue 6 ✔

It's taken me most of May complete three of the four items on my last to do list. At least there is some progress for the month. That's better than none.  Since life continues to be pretty busy, the goal with this week's list is to just keep moving on all the current projects. 

Weekly To Do List for 06/01/2021


Grassy Creek:  Start stitching down the binding

Grassy Creek, the 2020 Bonnie Hunter Mystery Quilt

The binding has been machine stitched to the front. All that's left is to hand stitch it to the backing.  I've got the clips in place and the thread selected, I just need to thread a needle and start stitching.

  

Morewood Mystery: Continue adding border #3

Morewood Mystery by Cheryl of Meadow Mist Designs

Two of the four border strips are added.  I need to measure the top again before I cut the final two strips for the top and bottom.  


Cabins and Fans:  Assemble row 3, start row 4

Cabins and Fans, self designed

I had to unstitch the second row, flip it and then restitch to the sashing.  The printed layout I'm working from didn't have the final block placement. Now that's worked out, I should be easily able to finish row three and make a start on row 4.  


Unity:  Make HSTs for clue 6 as leader and ender

Unity, 2020 Bonnie Hunter Sew-In-Place Quilt Along

Not a lot of progress on this project last month. Just one more block finished for the top border strip. Just 13 more blocks needed to finish this round of borders for Unity.  

That's my to do list for this week. With life being so hectic, I'll be happy if I can check off even just one thing on my list by the end of the week.  Linking up with ChrisKnits for To Do Tuesday.