Monday, November 12, 2018

Weekend Stitching: A Sewing Room Break

I'm very lucky that My Guy is very supportive of my quilting obession hobby, but he's been wistfully noting that we've not gone anywhere in awhile (he has what his mother called itchy feet).  So we tested our empty nester wings, took a couple of days off work, rented a cabin and ventured out to the Beaver's Bend Folk Festival  and Craft Show over the weekend.  The music was really good and the park was beautiful.  



It was very close to peak color, with the cold that seeped in overnight, what's left of the leaves will be gone.  But the leaves were gorgeous over the weekend.  Here are a few of my favorites. 







And my most favorite shot of the weekend.  



Now that I've got that out of my system, lets talk quilty stuff.  There's not much on that front.  We were gone all weekend, so there wasn't a lot of time in the sewing room.  I'm still stitching down the second wreath for the Christmas Mystery Quilt.  I did finish off last week's block before we left. 


Christmas Mystery designed by Carrie Randall (Quilter's Hideaway)

After messing with Ruldophs antlers, this block was a breeze.  Here's all the blocks we've done so far.


Christmas Mystery designed by Carrie Randall (Quilter's Hideaway)

This is going to be a fun quilt when it's all together.  I did make it back to town just in time to stop by the LQS on our way home to get the two blocks for this week.  I hope to make a start on those tonight.  

The only other sewing related thing that happened before we left town was selecting my fabrics for Bonnie Hunter's Good Fortune mystery quilt along that starts a week from this Friday. 



I wasn't a fan of the red and orange, so I changed those out for magenta and black.  I'm going scrappy with the neutrals.  Hopefully these will all play well together.  

Linking up with the usual Monday parties, you can check those out here:

Monday Making
Main Crush Monday
Monday Design Wall

Sunday, November 11, 2018

Week 45 of 2018: Stitching and De-stashing

It's November and winter seems to know that its time has come.  A record low was recorded at the Tulsa airport yesterday morning.  Glad I was tucked up on the couch cuddling under quilt with a warm cup of coffee, with no where I had to be yesterday. 

It's also Sunday, which means it's time to assess how well the stitching and de-stashing are going. 



First the state of the stitching for the week:

15 minutes stitching days/week = 6/7 days
15 minutes stitching days/Nov = 9/10 days
15 minutes stitching days/2018 = 294/314
Success rate = 93.63%

Time change has really been messing with my sleep and there was just one day that going to bed was preferable to doing any stitching. I've still managed to get in some stitching more than 90% of the time, so that goal is still on track.  You can share how well you did on finding time to stitch at the bottom of the post, Mr Linky is all set up.

The stash management for 2018 hasn't been so good.  That's been off track for months now. 

Fabric used this week = 0.88 yards
Fabric used in 2018:  39.52 yards
More in than out for 2018

Still there was a bit more going out with nothing new coming in.  That's a good week on the stash management front these days. Linking up with Quiltpaintcreate for the weekly stash report. 

I've been doing a bit of hand stitching this week, trying to get caught up with the Christmas Mystery blocks.


   
This is peak at the second Dresden Plate wreath.  The inner circle is all stitched down, but I just started on the outer fan blades.  Linking up with Kathy's Quilts for Slow Stitching Sunday. I hope to make a bit more progress today.  

So how did you do on finding time to stitch this week?  



1. Julie in GA
2. Meloney
3. maggie f
4. MartiDIY
5. Aileen
6. Shasta

Powered by... Mister Linky's Magical Widgets.

Tuesday, November 6, 2018

November Plans - The One Monthly Goal

The One Monthly Goal hasn't gone so well for me this year. I've gone from being wildly successful with OMGs the previous two years, to missing the mark more often then not this year.  Due in part to trying to finish a UFO each month and then not having the stitching time to do it.  Work has been a bit more nuts this year than the previous two.  So the key to being successful is not being over ambitious when setting my November One Monthly Goal. 


So what's likely to get done?  We'll have a lot of family stuff the week of Thanksgiving, so I won't have as much time to stitch as normal that week.  And we have some commitments this weekend that will impact my stitching time.  So the goal for this month needs to be a pretty small one.  There are two projects in the queue that are closed to being finished.  The first is the Halloween Mystery quilt (BOO!).  

Halloween Mystery
designed by Carrie Randall (Quilter's Hideaway)

It needs a label and the binding pieced then sewn down. That's doable.  

The second and probably higher priority is to get Inverted Star finished.  

Inverted Star block by Jessica Boschem of Common Threads
available from Craftsy as a free download, setting by Kate

It needs a backing pieced and then both have to be prepped so it can go out for quilting.  Piecing the backing is probably doable.  Cleaning off the loose threads from the back of the top and getting it all pressed is going to take some time.  That's going to be a tall order when I've got two weekends with limited sewing room time.  

So looking at the time available, I'm going to go for getting a back pieced for Inverted Star as my one monthly goal.  If I can get it prepped for quilting and out the door even better.  But I honestly do not think I'll get that far.

Linking up at Elm Street Quilts for the November One Monthly Goal.  

Monday, November 5, 2018

Weekend Stitching: Second Star to the Right and Other Stories

It was a good weekend for recharging.  Too windy and cold to do much outside, it was a nice excuse to spend most of the weekend sewing.  Though I did manage to tame Mount Laundry and even made a run to Goodwill which decluttered one corner of the bedroom.

One thing I've learned this year is that pulling out a project a month will not help me finish off my UFOs.  It does move projects along, but not all projects can be finished in a month. I did better on finishes last year when I set priorities and stuck with a project till it was done. So as I put my goals together for next year, that will be the plan.  Inverted Stars is the first one this year I've done that with (The fact that it's a graduation gift and needs to be finished just after Christmas pretty much forced the issue).  The final plain border has been added, so it's now a finished flimsy.

Inverted Star block by Jessica Boschem of Common Threads
available from Craftsy as a free download, setting by Kate
   
I'm really happy with how this one worked out.  This is for one of the Scientists in Training's friends who will be graduating from college in December.  The SIT and I agreed on "Second Star on the Right" as the name for this quilt since her friend will soon be heading out on her own to pursue her dreams of being a screen writer (with an accounting degree as her safety net).  Next step is to figure out a back.  

The other goal this month has been to keep up with the clues for the Christmas Mystery quilt.  I've finished two thirds of clue two and all of clue three. 

Christmas Mystery designed by Carrie Randall (Quilter's Hideaway)

The second wreath is still being stitched to the background, but Rudolph is finished.  Those antlers took forever as I kept putting the pieces together in the wrong order.  The seam ripper got a good work out with that block.  I've made a start on this week's clue, but it's still mostly in pieces at the sewing machine. 

That's it for me this week.  Linking up with the typical Monday show and tell linky parties. 

Sunday, November 4, 2018

Week 44 of Stitching and De-Stashing

It's been a nice relaxing weekend, much needed after the madness of work last week.  I've taken advantage of the cold, windy, and wet weather to just hang out in the sewing room. It's been easy to get in my 15 minutes of stitching the last couple of days. 



But that wasn't true earlier in the week.  I missed a day (work stuff was the priority). 

15 minutes stitching days/week = 6/7 days
15 minutes stitching days/Oct = 29/31 days
15 minutes stitching days/Nov = 3/3 days
15 minutes stitching days/2018 = 288/307 days
Success rate =93.81%

There are just going to be weeks like that unfortunately. My goal was to hit 90% and I'm still on track there. 

On the stash front there is a bit out but nothing in. 

Fabric used this week = 0.37 yards
Fabric used in 2018 = 38.64 yards
More in than out for 2018

That's a good week for me.  Linking up with Quiltpaintcreate for the weekly stash report. 

With the madness at work, it's been nice to have a bit of slow stitching going on.  



The Christmas Mystery Quilt has two Dresden Plate blocks that I'm hand appliqueing to the background.  I'm not a huge fan of applique, my machine never seems to handle it well (or maybe it's my machine skills that don't handle it well).  I'm finding that I don't mind a bit of hand applique.  It's slow going, but it's not too bad.  They'll be done before the rest of the blocks are finished. Linking up with Kathy's Quilts for Slow Stitching Sunday. 

If you are keeping track of how much time you manage to fit in your stitching during the week, please link up below.  



1. Julie in GA
2. maggie f
3. Meloney
4. Christina's Handicrafts
5. Aileen

Powered by... Mister Linky's Magical Widgets.