Saturday, October 20, 2018

Rainbow Scrap Challenge - Playing with Colors

It's Fall Break in our neck of the woods this week.  The Scientist in Training is home for the long weekend.  I expect she'll sleep in this morning as she didn't get the chance to yesterday as her car had to go in for service.  That meant an early departure for Tulsa yesterday morning. But she got some shopping and cheesecake out of that deal.  While she's sleeping in, I'm hoping to get caught up on email and my blog reading before heading out to the local quilt shop for the second Christmas Mystery Quilt clue. 

There's been a fair amount of scrappy sewing going on.  Two of October's Squared Away blocks are up on the design wall. 


 Squared Away Sampler
designed by Mari (The Academic Quilter) and Angela (Soscrappy)

There's not much dark or sage greens in my stash, so I decided to switch to red-violet for this month's blocks.  These may look purple, but they definitely are more "pinkish" then my purple blocks.  I've got the background cut for the last block, but don't have the focus fabric cut yet.  The last block should get finished this weekend.  Then I can play with layout and sashing options for the whole set.  Maybe I'll actually get this year's Rainbow Scrap Project finished before I start next year's.  Thank you Angela and Mari for such a fun RSC project this year.  

The other scrappy project sharing design wall space with the Squared Away blocks is my 2014 RSC projected, the Inverted Star blocks. 


Inverted Star:  Center blocks by Jessica Boschem of Common Threads
available from Craftsy as a free download.  Setting by Kate

The scrappy sawtooth stars for the next border have been moved here and there on the design wall this week, but a final layout did finally come out of all the fiddling.  I'm hoping to get all the sawtooth star blocks stitched together this weekend.  

Linking up with Soscrappy for this week's Rainbow Scrap Challenge party and on Sunday, linking up with Oh Scrap.  

Monday, October 15, 2018

Weekend Stitching: Finally a Finished Flimsy

We are getting a preview of winter this week.  Lows in the 30's with the high at 50 F for today.  We finally turned the heat on yesterday afternoon to avoid waking up this morning to a very cold house.  Thankfully we'll be back to highs in the 60s in just a couple of days. 

I got as far as opening the boxes containing my new sewing table.  The insert wasn't included, that will come later.  So I'm leaving everything boxed up till those come, hopefully they will be here sometime next week.

It was a good weekend at the sewing machine, the big design wall is empty again.  The Halloween Mystery quilt has made it to finished flimsy stage. 

Halloween Mystery
designed by Carrie Randall (Quilter's Hideaway)

It's not a large quilt, just 49" by 55".  The top was pieced completely from stash fabrics. Not sure how all those Halloween prints ended up in my stash, but it was fun to use them in this project. I finished off the backing (completely forgot to take any photos), pressed and de-threaded both the flimsy and the back. Now the project is ready to send out for quilting. All that's left is to make the binding and the quilt label.  I'm leaning towards "Boo" as the name for the label.  Not very original, but it definitely fits.  

The design wall will not stay empty for long. The plan is to put the Inverted Star project back up and get the star border laid out and stitched together.  That one needs to get done before Christmas.  

Linking up with the usual Monday linky parties. 
Monday Making
Main Crush Monday
Monday Design Wall 

Sunday, October 14, 2018

Week 41 of 2018: More Stashing and Stitching

Sanity sewing was right at the top of my to do list this week, so getting in my 15 minutes of stitching each day wasn't hard. 



Plus now that it's getting dark earlier, my sewing room excursions are getting longer, so it was a lot more than 15 minutes each day. 

15 minutes stitching days/week = 7/7 days
15 minutes stitching days/Oct = 13/13 days
15 minutes stitching days/2018 = 269/286 days
Success rate = 94.06%

I'm hoping to finish the year with a success rate of 90%, so I've got a bit of cushion at the moment.  Hopefully I won't need it, but life is going to be hectic the next couple of months with holiday doings and looming project deadlines at work. 

Thanks to everyone who gave feedback last week on the 15 minutes of stitching linky parties for next year.  The linky will go live each Sunday (baring unforeseen Internet issues).   You can link up for this week at the bottom of the post. 

My stash busting isn't going so hot this year. I really need to just delete those Connecting Threads sale emails!  Oh well, it's nice to have a good selection when I'm ready to make a project.  Thankfully, there was a bit of stash going out this week.

Fabric used this week: 0.91 yards
Fabric used in 2018: 34.87 yards
More in then out for 2018

The plan is to finish a few quilts in the next couple of months. Hopefully the borders, backings and bindings on those projects will help up the outgoing numbers and I can meet my goal on the out going side at least.  Linking up with Quiltpaintcreate for the weekly stash report.

I'm really excited to get up to the sewing room today and get my new sewing table all set up.




At the moment it's sitting in the dining room still in the boxes. But I hope to enlist My Guy's help to get it upstairs. That small box is heavy! 

Happy stitching this next week.  You can link up below to share how you did on finding time to play with thread and fabric. 



1. Julie in GA
2. Meloney
3. maggie f
4. Aileen
5. Jennifer in Indy
6. Christina's Handicrafts
7. Shasta

Powered by... Mister Linky's Magical Widgets.

Saturday, October 13, 2018

Rainbow Scrap Challenge: The Dark Side

It's been cold, wet and rainy much of this week.  Autumn has definitely made it's appearance.  On the one hand it's nice, there is more reason to spend time in the sewing room. On the other, the earlier sunset seems to sap my energy to do anything.  

I did find the energy last week to finish off September's dark neutral blocks for the Squared Away Sampler. 


 Squared Away Sampler
designed by Mari (The Academic Quilter) and Angela (Soscrappy)

I changed up the blocks just a bit from Angela's and Mari's version.  This block would make a really cool quilt, but for now I'm stopping at three.  There has been progress on the October blocks, but not enough to be photo worthy.  I'm deviating from Angela's dark and sage green theme for October by using red-violet for my blocks.  Hopefully, I'll have something to show on that front next week. 

Happy stitching this weekend.  Linking up with Angela at Soscrappy for this week's Rainbow Scrap Challenge.   And linking up with Oh Scrap on Sunday.  

Wednesday, October 10, 2018

2018 Finish Along - Fourth Quarter Projects

We are already into week two of the fourth quarter.  Time flies, especially this time of year. Hard to believe it's time to decide on what projects go on the list as potential finishes for the fourth quarter of the 2018 Finish Along. 



Out of all the projects on my 2018 Quilt Plan, only three have made it to completed status.  That leaves nine quilts left that could go on the list for this quarter. Out of those nine, there are three that have a good chance of making to to the finished list. 

1.  Halloween Mystery Quilt (new start)


 Halloween Mystery
designed by Carrie Randall (Quilter's Hideaway)

The rows have all been sewn together since this picture was taken and the first border strip has been attached.  The second border strip is pinned, ready to sew on.  So this one has a good chance of making it to the finished stage.  It's not on my UFO list, but finishing it will keep it off the list.  That counts right? 

2.  Inverted Star (From Third Quarter Quilt Along list)


 Inverted Star by Jessica Boschem of Common Threads
available from Craftsy as a free download

The center is all stitched together and the blocks for the pieced border are all done. Now to figure out where those stars go in the border and start stitching them together.  It will also need a backing pieced before it can go out for quilting. This is a graduation quilt for one of the Scientist in Training's friends.  The friend graduates in December so this one really needs to get done. 


3.  Christmas Angels (From the second quarter list)


 Christmas Angels  Pattern by Kate

Another project that just needs the borders and the backing finished so it can be sent out for quilting.  It would be nice to get this one done so it could be gifted as a Christmas present this year. 

The top two are definitely doable, not sure about number three.  Maybe.  But since there is no penalty associated with not getting everything on the list completed, I'll add one last project to the list.  

4.  Vintage Dresses (from the first quarter list).


 Vintage Dresses blocks by Charise Randell, Setting by Kate


This was supposed to be a high school graduation gift, but it didn't get done in time.  This quilt also just needs borders and backing so it can be sent out for quilting.  It would be nice to get this one finished too, but I'm not counting on it.  

That's my list for the fourth quarter quilt along.  If all four of them get finished, that will be seven total quilts completed for 2018.  That would tie my best year in terms of finishes. Fingers crossed that I can get that far.  

Linking up with the Fourth Quarter 2018 Finish Along.