Tuesday, October 9, 2018

2018 Ambitions: Uneven Progress, The Third Quarter Summary

Way back in December of 2017, I participated with Quilting Jetgirl's 2018 Planning Party by putting together a set of quilting ambitions for the year.  Now that third quarter is over it's time to assess how things have gone so far this year.  

Ambition #1: Shorten the UFO List


If you compare the above chart to the one I posted on the mid-year update, I've gone down by one.  So there's been progress, just not a lot of it.  I'm doing a good job of finishing my newer projects, but not so hot at finishing off my older projects.  I've been pulling out a new UFO a month to work on and there's been a lot of progress on each, but I've just not managed to get many to the completed quilt stage. 

Ambition #2:  Participate in select quilt along/mysteries

 Squared Away Sampler
designed by Mari (The Academic Quilter) and Angela (Soscrappy)
The 2018 Rainbow Scrap Challenge Project
            
I'm actually up to date on this year's Rainbow Scrap Project, Squared Away.  All but October's blocks are done, I just don't have an updated picture yet. 

I had planned to participate in the Meadow Mist Design's Plus Sign Sampler Quilt Along, but the sampler just didn't appeal to me.  So instead, I signed up for the Halloween Mystery quilt along at my local quilt shop.  

 Halloween Mystery
designed by Carrie Randall (Quilter's Hideaway)

The Halloween mystery was such fun, that I've signed up for the Christmas mystery as well.  That one isn't on my list, but it uses up stash (that's my excuse and I'm sticking to it).  I'm also planning to do Bonnie Hunter's annual mystery quilt that should kick off at the end of October with the fabric requirements.  

Ambition #3:  Find 15 minutes to stitch each day.


      Success rate = 93.95%

This ambition is on track.  I'm hoping to end the year at 90% or better. 

Ambition #4: Stash Management
     Purchase less than 5 yards per quarter - nope didn't happen
     Organize the stash - a little progress
     Use only stash fabrics for any new projects - on track

Ambition #5:  Blog once a week
      121 blog posts for 40 weeks = 3/week

So I'm on track here. 

So everything is on track except for finishing quilts and stash management.  Areas to work on for 2019. 

Here's the project progress since midyear:

February Project: Magnolia Mystery - Done

 

April Project: En Provence - Done

 




June Project - Red, White and Blue Stars (blocks finished)

 

July Project - Inverted Stars (border blocks finished)

 


August Project - Twinkle Star Quilt (blocks finished)

 

September Project - On Ringo Lake (made more blocks)

 


So there were two finishes last quarter, plus a lot of progress.  So it's all good.  Hopefully there will be at least two finishes for the last quarter.  I have a graduation quilt to finish before Christmas!  

Good luck with your ambitions for the fourth quarter.  It's always a busy time of year.  

Monday, October 8, 2018

Weekend Stitching - Seasonal Stitching

For a weekend with nothing going on, it was surprisingly busy.  The Scientist in Training was home, deciding on Thursday that she needed a weekend out of the dorm and some home cooking.  Since she had a lot of studying to do, I stitched while she worked on classwork. 

The final clue for the Halloween Mystery quilt along at the local quilt shop came out.  I finished all the blocks and started assembling the top.  

Halloween Mystery
designed by Carrie Randall (Quilter's Hideaway)

Not my normal style, but it was a lot of fun to make.  I even manged to finish the 4 applique blocks.  I plan to add a couple of borders to make it lap quilt sized.  As far as a final home, no decision on that yet.  My sister and my niece are both big Halloween fans, so it could end up under the tree so they have something to use for the season next year.  We'll see.  I am hoping to get this one to finished flimsy stage, a back made and get it sent off for quilting by the end of the month.  It would be nice to have another finish for the year.  

There has been slow and steady progress on the Twinkle Star blocks.  The last block was finished over the weekend.  

Twinkle Stars
Tutorial by Andrea Feldbush of Soscrappy

Laying out the blocks with the colors along the diagonal works really well.  This isn't the final layout, there needs to be a bit of moving around to address some of the really dark stars.  For now these blocks are back in the project box. As much as I'd like to finish this one off, I have another graduation quilt that needs to be done by December, so the Twinkle Stars need to come off the design wall for now.  I'm sure they will be back early next year.

It's going to be a long week at work, with lots going on.  Sanity sessions in my sewing room are going to be very necessary.  

Linking up with the usual Monday crowd.
Monday Design Wall
Main Crush Monday
Monday Making   

Sunday, October 7, 2018

Week 40 of Stitching and De-stashing

October has gotten off to a calm start after the madness that was the end of September.  Finding time to get into the sewing room was a bit easier, well most days anyway.  



There were a couple of days where My Guy had to stay late at work (we drive together, so we have to leave together).  But even those evenings I got in my 15 minutes.  

15 minutes stitching days/week = 7/7 days
15 minutes stitching days/Sept = 30/30 days
15 minutes stitching days/Oct = 6/6 days
15 minutes stitching days/2018 = 262/279 days
Success rate = 93.91%

So it was a another good week on that front.  You can link up below to share how your stitching week went. 

It was even a pretty good week for stash usage. 

Fabric used this week: 1.21 yards
Fabric used in 2018: 33.96 yards
More in than out for 2018

Linking up with Quiltpaintcreate for the weekly stash report. 

Now that we are in the last quarter of the year, performance reviews at work are looming. As I reflect on what got done on the job, it's just natural to look at what got done on the stitching front and start thinking about what do I want to change up in 2019.  The participation in the 15 minute to stitch link up has been pretty steady during the year, so I'll likely keep the linky party going for next year.  But I was wondering if there were any suggestions for changes for next year's linky parties.  It would be hard for me to move the link up date, Sunday morning can usually be counted on to be my down day.  But is weekly too frequent, would monthly be better?  If you have a preference or other suggestions for the 15 minutes to stitch linky party, I'd be interested in your input. So leave me a comment after you link up this week.



1. Julie in GA
2. maggie f
3. Meloney
4. Christina's Handicrafts
5. Aileen
6. Shasta

Powered by... Mister Linky's Magical Widgets.

Friday, October 5, 2018

October One Monthly Goal - Missing the Mark

We are almost a week into the month, so it's time to pick a One Monthly Goal. But deciding on October's One Monthly Goal has been a challenge.  


This is my third year to participate in the OMG and it's been my worst in terms of actually completing the selected goal each month.  I've been trying to figure out why the previous two years I only missed one or two monthly goals, but this year I've missed completing my goal five out of the nine months.  What's even crazier, I've had more sewing time this year.  Maybe I've just been too ambitious on my goal for each month?  Am I working on too many projects at a time, so there's not enough focus on the OMG project?  Probably a bit of  both. 

So this month, I should pick something more limited in scope than I have in previous months.  There are two that come to mind.  The first is to finish all the blocks for this year's Rainbow Scrap Challenge Squared Away Sampler.  Two of Septembers blocks are finished. 

 Squared Away Sampler
designed by Mari (The Academic Quilter) and Angela (Soscrappy)
The 2018 Rainbow Scrap Challenge Project

The third has been started.  I'll need to make three of October's block, which hasn't been posted yet.  That should be doable.  

The other project that's doable is to finish off all the blocks for the Halloween Mystery Quilt.  This is what's finished so far. 

 Halloween Mystery designed by Carrie Randall (Quilter's Hideaway)

I still need to complete one more spiderweb and finish off the two bats, plus start on the final block that I wasn't able to pick up till Wednesday this week.  But that's definitely doable.

Of the two, I'm having a lot of fun with the Halloween blocks, so I think that will be the goal this month, to get all those spooky blocks made.  It will be a bonus if I get them all set together (but I'm not counting on that).  Maybe I can focus long enough to actually make my OMG for this month and raise my success rate to 50%? 

Linking up with Elm Street Quilts for the October One Monthly Goal.  

Monday, October 1, 2018

September Stitching: Progress not as Planned

Hello October! I was more than ready to say good-bye to September.  Work was a zoo last month. Though, it's not going to be much better on that front this month. Performance reviews and a high priority project are going to keep this month busy there.  Shoulder problems sidelined me the last week of the month, but on the bright side, that forced me to deal with the poor ergonomic set up of my sewing table.  

The final coup-de-gras for the month was not paying attention to where things were on my cutting/ironing table and my wrist made contact with my iron.  I'm not sharing any photos as a burn that matches up with the top 2" of an iron is just not a pretty sight.  I probably should have gone to the doctor, the burn was deceptively deep (that wasn't obvious till I debrided all the dead skin a couple of days afterwards).  Just know that a good iron set for cottons is capable of doing significant damage and be very mindful of where it is versus where your limbs are.  

Now on to the more fun quilty stuff that happened the last week.  My One Monthly Goal for September was to get all the block pieces made for the On Ringo Lake project.  I definitely bit off more than I can chew this month.  There are 8 flying geese in each block.  That's a lot of sewing and trimming.  I managed to make enough pieces to finish 5 more blocks. 


On Ringo Lake, Bonnie Hunter 2017 Mystery Quilt

The pieces for four more blocks are laying over on the sewing table waiting to be sewn into blocks.  I need about 38 for my version, so I'm about halfway there.  So not enough progress to link up with Patty's OMG post, but I'm happy to have moved the project along just a bit. 

One reason there wasn't more progress on ORL is the Halloween Mystery quilt sponsored by the local quilt shop.  It sounded like too much fun to pass up.  The third spiderweb is all stitched together. 


Halloween Mystery
designed by Carrie Randall (Quilter's Hideaway)


The strips for the fourth web are cut out.  Hopefully that block gets finished this week. Last week the assignment was to make 4 applique blocks.  I finished the two ghosts.


Halloween Mystery
designed by Carrie Randall (Quilter's Hideaway)

I'm not fond of applique, but these two weren't so bad.  With the shoulder problems last week it was nice to have something that I could finish by hand.  I've made a start on one of the two batty blocks. Those blocks need half of a Dresden plate block and I'm struggling a bit with that part.  Hopefully that will get resolved this week too.  We went to see the Scientist in Training this weekend, so I will not be able to pick up the last clue till Wednesday.  

Hopefully, I've identified all the hazards in my sewing room and October will be an injury free month.  Linking up with the usual Monday linky parties. 

Main Crush Monday
Monday Making
Monday Design Wall