Showing posts with label counted cross stitch. Show all posts
Showing posts with label counted cross stitch. Show all posts

Tuesday, June 3, 2025

To Do List for the Week of 06/03/2025

We were in Texas all last week to attend Grad Girl's thesis defense and then just hang out with her afterwards for a bit of a celebration. Poor girl hasn't had a real vacation in over a year.  The presentation of her work was public, so we were able to attend that. Afterwards we waited in the hallway while she took questions from her committee. 

It was a good week, other than the flat tire issues. We picked up a large bolt somewhere on Sunday/Monday. By Monday night we were running with the spare (thank goodness Grad Girl has a car).  After two visits to the tire shop and the locating of a second leak that wasn't patchable, we ended up having to replace the tire on Saturday.  We had to make a few compromises on activities, but only canceled one planned outing due to needing to be back in time to pick up the car on Saturday.  

We didn't get home till late last night.  Now I have unpacking and laundry to do.  But before I get to all of that, I need to decide what's on my to do list for the sewing room.  Last week's list was short and sweet (necessary with all the travel and thesis defense activities). 

To Do List for 05/27/2025

1.  Hand stitching: embroidery or counted cross stitch ✔ 

I'm hoping that my stitching mojo is back. The fact that mid-year is almost here may have a lot to do with me feeling like I need to get back to the sewing room.  I'm going to be ambitious with this week's list. If I don't check off every item that's OK.  If there is progress on the first three, it will have been a good week.  

To Do List for 06/03/2025

1.  2025 Guild BOM: Finish cutting fabrics for the blocks

The neutral background is cut for the inverted star. The colored pieces for that and all the pieces for the sawtooth stars need to be cut.  If I can start assembly that would be great.  

2.  Glowing Hearts (MMM Quilts): Finish assembling quilt top




The first two rows are sashed, assembled and sewn together. Assembly of the third row was started.  I should be able to get this to finished quilt top pretty quickly. 

3.  Kate's Choice: Continue quilting blocks

There's been no progress on this project for several weeks.  I'd like to have a finished quilt by the end of the month.  That may be a bit ambitious, but no reason not to pursue that goal.  

4.  Betty (Meadow Mist Designs): Find backing, figure out assembly





This is my Chookshed Challenge project for June. The quilt top was finished last year and needs to be quilted. I'm hoping to actually get the backing made sometime this month, but figuring out the fabric and the assembly part will set me up for that later this month.  I really need to concentrate on finishing a few quilts if I'm going to meet my goals this year.  

5.  Old Town (Bonnie Hunter): Assemble blocks at late night sew

Another project I've not worked on for a few weeks. I need to figure out where I'm at with it.  I know all the blocks pieces are cut, just need to get all the subunits made.  

6.  Embroidery or Cross Stitch: Stitch one night this week

Both my embroidery and cross stitch projects have been just travel projects.  If I'm going to make progress, they need to be worked on more frequently.  

7.  Wild and Goosey (Bonnie Hunter): Finish green, sash orange blocks



All the orange blocks are finished, but they need to be sashed with black to make 7.5" blocks.  I've already sashed all the yellow blocks. I'm trying to decide if I assemble this as a medallion quilt, start with the center and add each color as borders.  That might be easier then making it in rows.  I still have time to work that out.  I'll still work making a few 3.5" red blocks this month. I only need a few more to have all the red ones needed for the design. This project won't get finished this year, but I'm hopeful it will be ready for assembly next year.   

8. Simply Sensational Summer Scrap Quilt (Kevin the Quilter): Continue as leaders and enders. 

The plan is to assemble the center and start on the borders. I don't want to make any more 4 patches until I see if I need more yellow or blue. I'm close to my estimated counts.  I'm hopeful this will be a completed quilt top by the end of the year. 

It's a long list, but most of the items are just to make progress. I think I can do that this week.  Linking up with the Quilt Schmilt for To Do Tuesday.  

Tuesday, May 27, 2025

To Do List for the Week of 5/27/2025

This is my second week of low sewing mojo.  Consequently, my to do list from last week is looking pretty anemic. 


To Do List for 05/20/2025

1.  2025 SAHRR: Finish binding ✔

2.  Glowing Hearts: Finish piecing blocks, start assembly ✔

3.  2025 Guild BOM: Cut fabrics for July blocks - progress

4.  Old Town: Work on blocks at late night sew - no progress


Now that I've typed out the list, it's not so bad.  Two check marks and progress on the #3 of 4 items really isn't a bad week. Even so, I'm going to try a different tack this week. 


To Do List for 05/27/2025

1.  Hand stitching: work on counted cross stitch and/or embroidery projects.   




During my recent sewing room reorg, I found an old unfinished counted cross stitch project.  The Dale Burnett project book that goes with this was copyrighted in 1982. I did a lot of counted cross stitch during my high school and college years. That would put the start date for this project sometime between 1982 and 1985. It's been a long while since this project has gotten any attention.  So in an effort to salvage some stitching mojo, I'm going to try my hand at counted cross stitch again.



I have no idea what the stitch count is for the background throw, but it's pretty small stitches.  My eyes just aren't as good as they used to be. I may work on this for a bit and then switch over to my butterfly embroidery project.  We'll see if I make any progress on either project this week.

I'm going to keep it simple this week and see what happens. If I make it into the sewing room great, if I end up with 7 days of hand stitching, that works too. Linking up with To Do Tuesday over at the Quilt Schmilt.