Monday, October 26, 2026
The Fourth Finish
Tuesday, October 13, 2026
To Do List for the Week of 10/13/2026
My mother's 84th birthday was this weekend. We went to visit and take her out for dinner along with the rest of the family. So I missed one day of stitching this week. There was still good progress on last week's to do list.
To Do List for 10/6/2026
1. Squared Away: Make label and binding, trim quilt ✔
2. Glowing Hearts: Continue quilting ✔
3. Celtic Solstice: Finish quilt assembly, decide on borders ✔
4. Marigold Mystery: Finish Sept blocks, start Oct- progress
5. 2026 Guild BOM: Start assembly - progress
6. Wild and Goosey: Continue working on teal/purple blocks ✔
Definitely not a bad week considering I missed one of more productive days in terms of sewing room time. Hopefully I can do as well this week.
To Do List for 10/13/2026
1. Squared Away (Soscrappy): Finish binding.
The binding and label got made. The binding it sewn to the front, but I didn't get very far on stitching it to the back. Only the part between that green clip near the top and that first blue clip on the bottom has been stitched. Still lots to do on that this week.
2. Glowing Hearts (Sandra Walker): Continue quilting
The top three rows of hearts are all quilted. Just one more row of hearts, the sashing and the borders left. I've decided what to quilt in the sashing strips and am working out an idea for the borders.
3. Celtic Solstice (Bonnie Hunter): Work on borders
The blocks for the pieced border are coming along, slowly. I'm still hoping to have Celtic Solstice to the finished quilt top stage by the end of the month.
4. Marigold Mystery (Meadow Mist Designs): Finish Sept, cut fabrics for October blocks
One of the five Ohio Star blocks has been finished. A second one is partially assembled. I should be able to finish the September blocks this week and get going on the October blocks too.
5. 2026 Guild BOM: Start Assembly
I didn't make a lot of progress on this project, but I did make some progress on the border strips for the Carpenter Star block. Still lots to do on this project.
6. Wild and Goosey (Bonnie Hunter): Continue working on teal/purple blocks
Sashing the teal blocks should be done this week. Just two teal blocks left to complete. Then it will be all purple till those get finished.
There is lots I'd like to get done before the end of the month. Realistically, it's not all going to get done. I'll try to be happy with whatever progress I can manage this week.
Linking up with the Quilt Schmilt for To Do Tuesday.
Wednesday, October 7, 2026
Third Quarter Progress on the Quilting Strategy
Since September felt like August, it's surprising to realize it's October. Third quarter is over and we've started fourth quarter. Just three months left in the year! I'm always amazed at how fast the last half of the year goes. It's definitely time to take a look at what my strategic plan for the sewing room was for 2026 and see how I'm doing on the execution part.
1. Guild BOM 2026
All the blocks are finished and all the sashing/border strips are cut, now it's just assembly time.
2. Wild and Goosey:
Continued to use two blocks as my leaders for the quarter, plus I've been sashing blocks as I finish a color. I've got quite a pile of blocks finished at this point. Just the purple blocks to finish now.
3. UFOs to move to finished quilt tops
Three projects progressed this quarter. Lupine and Laughter, plus Good Fortune are quilt tops. All the quilt blocks for Celtic Solstice were finished before the end of the quarter. There wasn't any progress on the Simply Sensational Summer Scarp Quilt. Both Good Fortune and Celtic Solstice needed a lot of blocks constructed. I'm not unhappy with the progress on these UFOs that needed borders or blocks finished.
4. Quilts to Quilted with my Walking Foot
There was good progress on quilting Glowing Hearts, but it's only about half finished. So there was no progress on Betty during the quarter. I am getting a better feel on how much quilting I can actually get done in a quarter. That will help me set my strategy for 4th quarter and next year.
5. Quilts to send Out for Quilting
Squared Away is back from the quilter, but it's not trimmed or bound yet. At least it's quilted. Magnificent Mystery didn't see any progress. My Girl has now given me the complete list of quilts to be given to the grad school friends for graduation and an expected graduation date for each. That will set the order for for which quilts go out next.
6. Planned New Starts
The Meadow Mist Designs 2026 mystery, Marigold, kicked off back in July. The block clues started in August. This is my 12th Meadow Mist mystery, it's one of the few new projects I've allowed myself over the last few years.
Looking at the progress for third quarter, I've been pretty successful at moving UFOs from sets of blocks to finished quilt tops. Less successful on moving projects to being quilted. Things to consider when I decide what's the plan for 4th quarter and next year. Even though my strategy for 3rd quarter wasn't fully implemented, there was still really good progress. I've done better this year than last, so I'm feeling pretty positive about how 2026 has gone in the sewing room. Now to figure out what's the strategy for 4th quarter.
Tuesday, October 6, 2026
To Do List for the Week of 10/6/2026
Not quite a full week into October and it feels like the month is rushing by. Probably because we've got stuff on the calendar for this month. Not fun stuff, necessary stuff.
I took a lazy approach to last week, but I still didn't do too badly with my to do list.
To Do List for 9/29/2026
1. Squared Away: Make binding, sew to front - no progress
2. Glowing Hearts: Continue walking foot quilting ✔
3. Celtic Solstice: Continue quilt top assembly ✔
4. Marigold Mystery: Finish September blocks - progress
5. 2026 Guild BOM: Start quilt assembly - no progress
6. Wild and Goosey: Continue teal/purple blocks ✔
Not a bad week considering how unmotivated I was on the sewing front after my trip to see My Girl. I probably jumped the gun by putting both Squared Away and the 2026 Guild BOM on the to do list for last week. They will show up on this week's list because both need to get moved along.
To Do List for 1/6/2026
1. Squared Away (Soscrappy): Make binding, make label, trim
Putting this project on last week's list was probably jumping the gun. This project is a gift for one of My Girl's college buddies, so I need her input on the quilt name and a message for the label. She's been busy so hadn't really put much thought into it. We now have a name, so I can start on the label. Hopefully this will be ready for binding next week.
2. Glowing Hearts (Sandra Walker): Continue quilting
I'm half way finished quilting the top row of the quilt. I should finish that row this week and maybe get started on the last row next week. I'm getting to the point I need to figure out how I'm quilting the sashing and the borders.
3. Celtic Solstice (Bonnie Hunter): Finish quilt top assembly, decide on borders
All the row are sewn together. Just two long seams and the center of the top will be assembled. I need to finalize what the borders are going to look like and get the fabrics cut for those.
4. Marigold Mystery (Meadow Mist Designs): Finish September blocks, start October blocks
The chain blocks from last month's clue are finished and the Ohio Star blocks have been started. Hopefully I'll at least get the fabrics cut for the October blocks this week.
5. 2026 Guild BOM: Start assembly
This has been on the list for the last two weeks with no progress. Once all the rows are sewn together for Celtic Solstice, I'll get started on getting this top assembled. It needs to be done by the guild meeting in November, so I best get started.
6. Wild and Goosey (Bonnie Hunter): Continue working on teal/purple blocks
Just a couple more teal blocks to sash and then I can concentrate on finishing up the purple 3.5" blocks. When the paper pieces run out, it will be necessary to see how many more are needed so I can do one last printer run. It's strange to know just one more batch of papers need to be printed to finish these blocks.
I'll need to be motivated this week to get to everything. Linking up with the Quilt Schmilt for To Do Tuesday.
Friday, October 2, 2026
September PHD Report
Wednesday, September 30, 2026
To Do List for the Week of 9/29/2026
Monday, September 7, 2026
Weekend Progress on UFOs
If you are in the US, hopefully you are enjoying your Labor Day holiday. Being retired, it's just another Monday in our schedule. Though we do usually skip our normal chores if it's a holiday, so we feel like we've celebrated. Which means I get a three day weekend in the sewing room.
My priority this weekend was to get Squared Away (Soscrappy) ready to go to the long armer this next week. If I want it back before Christmas that needs to happen. First job was to press and then cut the wide backing to size.
That was an all day deal as I had to fold the fabric two different ways to get it cut to size. But that's ready to go. Yesterday I started prepping the quilt top.
The first four rows are pressed and de-threaded. That leaves just two rows and the bottom border to take care of today. Unfortunately the black fabric that I used in the sashing unravels really easily, so there were a lot of black threads to remove.
That's a pretty good pile and I'm not done yet. But since most of the blocks have white/light backgrounds, getting those black threads off is important.
There wasn't much progress on Celtic Solstice (Bonnie Hunter), but there had been good progress earlier in the week. All the 4-patch chain alternate blocks were finished at the end of last month. The main block has lots of parts, 52 pieces per block. I had enough of the centers and corner units for 5 blocks, but needed to make the chevron units before starting to assemble the blocks. That meant I needed to cut fabric, so I cut all the parts needed to make the rest of the components.
I had enough of the orange/teal HSTs to make the block centers, but I still need some for the corner units. I've made a good start on the chevron units, had enough to finish up two more of the main blocks. So this is what was up on the design wall by the end of the weekend.
One block is sitting at the sewing machine partially assembled. Still lots of block components to make. I definitely won't finish all the main blocks this week, but I should make good progress.
Sewing time can be dangerous because it gives your mind opportunities to wander while you are sitting at the machine. My version of Celtic Solstice has been 13 years in the making. I started wondering if anyone else had waited so long. Looking that the Quiltville Open Studio page on Facebook, I found two quilters that just finished assembling their versions in February and August of this year. So I'm not the only one that didn't get back to her version very quickly.
Linking up with Patchwork & Quilts and Sew & Tell Monday.
Wednesday, September 2, 2026
August PHD Report
The big thing that sticks in my mind for August is just how hot it was all month. Normally we get those triple digit temps for a couple of weeks. It was pretty much the whole month, with just a few days of temps dipping into the 90's. It was a good month for sewing, it was too hot to do much else. No finishes last month, but there was still enough progress to do an August PHD report to link up with Ms. P Designs.
No finishes, but there was a new project started last month. It was a project I planned to start this year. It's a quilt along that won't finish till next year, so it doesn't have to get done this year. I've done pretty well at limiting the squirrels this year. This is my first new start since January.
Celtic Solstice, the 2013 Bonnie Hunter Mystery, has been on and off to my to do list since June of this year. There was finally some progress on this UFO in late August. It's my last unassembled BH mystery. All the 4-patch chain blocks are finished. Now to work on the piece heavy main block. That's going to go pretty slowly.
The next quilt to go out for long arm quilting is Squared Away (2018 Rainbow Scrap Challenge Sampler). This is another quilt for one of My Girl's college buddies. The plan was to pull a backing from the stash, but nothing I pulled worked. So we decided to take advantage of a sale and buy an extra wide backing. The plan is to get this to the long arm quilter before I leave to visit My Girl later this month.
Good Fortune (Bonnie Hunter) has moved from a set of blocks to a finished quilt top this month. I'm really happy with how it turned out. The pieced border was definitely worth doing. Now it goes into the to be quilted closet.
Work on the teal blocks for my version of Wild and Goosey (Bonnie Hunter) continued in August. Just 4 blocks to go and I'll be ready to sash the 3" finished blocks into 7" finished blocks for quilt assembly.
The quilting has been slow going on Glowing Hearts (Sandra Walker). I picked a denser quilting motif, so of course it's going to take more time. It's going to be worth it, I really like how it's turning out. Based on where I'm at, this going to be a September/October finish.
All the blocks for the 2026 Guild BOM have been made. Only the blocks through September are shown in the photo since that's all the guild has seen. I'm working on the quilt assembly instructions, with plans to start that in late September after the October block is shown to the guild. I need to get this quilt to finished quilt top so I can move on to next year's BOM and have that ready to go for the December meeting.
Marigold Mystery (Meadow Mist Designs) is the new project started this month. The August blocks are all finished. This is my 11th Meadow Mist Designs' mystery sew along. I've enjoyed all of them. The sew along doesn't end until next April, so I'm looking forward to several months of clues.
August was a good month. No finishes, but one project reached finished quilt top stage and another one is ready to prep for quilting. A new project was added, but it was a planned one.
All the work this month means there's a good chance for at least 2 more finishes before the end of the year. I'll take that!

















































