Showing posts with label Glowing Hearts. Show all posts
Showing posts with label Glowing Hearts. Show all posts

Tuesday, July 28, 2026

To Do List for the Week of 7/28/2026

We were home most of this week and with the triple digits outside staying in my sewing room seemed to be the best option.  I did get a lot done, it just doesn't feel that way.  

To Do List for 7/21/2026

1. 2025 Guild BOM: Make binding and label - progress
2. Glowing Hearts: Piece batting, prep backing ✔
3. 2026 Guild BOM: Cut fabrics for remaining blocks - progress
4. Good Fortune: Continue to assemble quilt 
5. Wild and Goosey: Continue making teal blocks ✔

Only three check marks, but there was progress on all 5 to dos from last week.  I'll take that.  The goal is progress, and that happened. It's pretty much the same list for this week.  

To Do List for 7/28/2026

1. 2025 Guild BOM: Bind quilt



The binding strips are all cut, they just need to be joined together.  The plan is to use my time at late night sew to get the binding sewn to the quilt.  I have a lot of hand stitching to do for this to get done this month.  

2. Glowing Hearts (Sandra Walker): Prep quilt top and assemble quilt sandwich. 




The quilt backing and the batting are laying on the My Girl's bed waiting for the top to be prepped.  I haven't completely figured out how I'm quilting this one.  Once the quilt sandwiching is done, I'll need to commit to something.  

3. 2026 Guild BOM: Cut fabrics for remaining blocks



I did get the fabrics cut for one of the blocks and actually got that one assembled.  That leaves the last two blocks.  I finally sat down and looked at what I needed for both, so I can optimize my strip cutting. I'm getting low on fabric and I don't want to run out.  

4. Good Fortune (Bonnie Hunter): Continue to assemble quilt. 

The third row is under construction, just 4 left to go. This project will take a back seat until I can finish up the 2025 Guild BOM.  There will be progress I'm sure, but it probably won't be a finished quilt top by the end of the week.  

5. Wild and Goosey (Bonnie Hunter): Continue making teal blocks

I need to cut some additional teal triangles because I'm running a bit low on that color.  I'm just a bit over halfway done with these blocks so I still need lots of scrappy triangles.  

If I can move each to do along a bit, it will have been a good week.  Linking up with the Quilt Schmilt for To Do Tuesday.

Wednesday, July 22, 2026

To Do List for the Week of 7/21/2026

We were in Dallas for the weekend, so I didn't get much sewing done. I worked a lot on the instructions for this year's Guild BOM, so that was my "stitching" activity for the weekend. That wasn't on last week's list, but it needs to get done.  There was some good progress on last week's to do list before we left.  

To Do List for 7/14/2026

1.  Glowing Hearts: Piece batting, start quilting - progress
2.  Guild BOM: Assemble August block ✔
3.  Good Fortune: Continue to work on blocks 
4.  Wild and Goosey: Continue working on teal blocks 

Three check marks and a progress is a good for a week with no weekend sewing room time.  I'm not sure how well this week is going to go.  The upstairs air conditioner quit cooling last night.  My sewing room is upstairs.  Temps are supposed to in the low 90s the next few days, but that's still a bit warm to be sewing in. I can sew at the local quilt shop or set up an alternate location downstairs. It depends on when we can get it repaired. With 100 plus temps the last week, it's not the easiest time to get someone out to look at an air conditioner.  Here's my list for this week, it probably won't all get done, but why not dream big. 

To Do List for 7/21/2026

1.  2025 Guild BOM: Make binding & label

  


I picked the quilt up from the shop yesterday. It needs to be trimmed, plus the label and the binding need to be made.  This quilt is a gift for one of My Girl's college buddies, so I sought her input for the binding.  Since this is a rainbow quilt, we decided on a rainbow binding. I tried to stick with dark to medium fabrics, hence the absence of yellow. I'm pretty sure the binding will get made, but since I won't have access to my big cutting table for an unknown amount of time, I'm not sure when this quilt will get squared up so I can sew on the binding.  

2. Glowing Hearts (Sandra Walker): Piece batting, prep backing




I have two large pieces of batting left over from the piece I used for Chilhowie.  If I sew those together, I'll have enough for Glowing Hearts.  I'll probably get the batting assembled. If I'm out of the sewing room till next week, prepping the quilt back won't happen.  

3. Guild BOM: Cut fabrics for the remaining blocks




August's block was shown at the guild meeting last night, so I can share that.  The plan is to start working on the remaining blocks.  If I can get all the block parts cut while I have each fabric out, it's much more efficient.  It would be nice to finish August with all the blocks finished so I could start quilt assembly.  November will be here before we know it!  

4. Good Fortune (Bonnie Hunter): Continue to assemble quilt top




The first row of blocks have been sashed, but they aren't back up on the design wall yet.  Fingers crossed this will be a finished quilt top by the end of the month.  

5. Wild and Goosey (Bonnie Hunter): Continue making teal blocks

I haven't counted how many more teal blocks I need. A little over half the blocks were made as of last week and only a couple more were finished during the week. So still need quite a few more before all the teal blocks are finished.  

It's an ambitious list. It would be even if I was sure of access to my sewing room. I'll be happy if even a little progress happens for each project. Linking up with the Quilt Schmilt for To Do Tuesday when it's posted. 

Tuesday, July 14, 2026

To Do List for the Week of 7/14/2026

It's been a laid back week.  Summer tends to produce a lot of those, it's too hot to do much outside, so why leave the house.  I didn't complete everything on my to do list, but there was progress on every item.  

To Do List for 7/7/2026

1.  Glowing Heart: Make backing, piece batting - progress
2.  Lupine and Laughter: Add last border ✔ 
3.  2026 Guild BOM: Cut pieces for last 4 blocks - progress
4.  Good Fortune: Continue making main blocks ✔
5.  Wild and Goosey: Finishing sashing blues, work on teals ✔

Three check marks and two with progress is a good week in my book.  Hopefully I can keep up the momentum this week.  

To Do List for 7/14/2026

1.  Glowing Hearts (Sandra Walker): Piece batting, start quilting 




The backing is pieced.  Glowing Hearts was made from a half yard bundle that I won as part of a blog quilt along or give away. There wasn't much left of the bundle, but there was enough with the addition of some of the background fabric to make the backing.  The green strips at the top and bottom were part of the bundle, but I didn't use that fabric in the hearts. Now to piece the batting and prep the top and back for quilting.  That always takes longer then I think it should.   

2. Guild BOM: Assemble August Block





The block needs to be ready for the July meeting, which is a week from today.  So I really need to get busy with the assembly.  If I can get parts of the remaining 3 blocks cut, that would be helpful.  But if I don't get that far, it won't be the end of the world.  

3. Good Fortune (Bonnie Hunter): Continue to work on blocks 





There are a lot of pieces to the main block in this project. Nothing new for a BH mystery quilt, but it does make for some slow going.  There has been progress, but I may be rethinking my approach.  

4.  Wild and Goosey (Bonnie Hunter): 





All the blue blocks are sashed and I've started working on the teal blocks again.  I have just a little over half of the teal and purple blocks needed for this project.  So I'll probably stick with teal until get all that color done and then go back to finish up purple.

A shorter list for this week.  What's left on my UFO list at this point all requires either quilting or block assembly.  Both of those stages tend to be the slowest of the process, so keeping the list short is probably wise.  Linking up with the Quilt Schmilt for To Do Tuesday.

Thursday, July 9, 2026

2026 Quilt Making Strategies: Third Quarter Plan

Hard to believe over half of 2026 is already past. The end of the year will come up quickly. So far I've stuck to the main strategy that was posted in January, but the priorities of some of the projects has changed.  That's not so bad.  The plan for second and third quarters was to focus on moving UFOs to finished, or at least closer to finished.  I'm going to stick with that strategy.

1. Guild BOM 2026




The 2026 Guild BOM has to be finished by the November guild meeting.  The first draft of the block instructions for the last 4 blocks are written.  The plan is to get all the blocks made this quarter and start quilt assembly.  I won't be able to complete assembly until October after the last block is shown, but doing all I can this quarter will help keep what needs to get assembled at the end to a minimum. 

2. Wild and Goosey. Continue to use two blocks as my leaders and enders. The goal is to have all the blocks done by the end of the year.  

3. UFOs to be moved to finished quilt tops.    




Lupine and Laughter just needs borders, so that should be a quick finish.  Good fortune still needs 7 of the star blocks constructed before assembly can start.  I do expect that project to make it to finished quilt top before the end of the quarter.  There may be some progress on Celtic Solstice by the end of the quarter.  I'm not sure the blue and yellow scrap quilt will see any progress at all.  It would be great if I get that far.  

4. Walking foot quilting.  





I've learned that it takes me a quarter to quilt one project.  So the goal for third quarter is to finish quilting Glowing Hearts. If I can make a start on Betty, that would be a really successful quarter. 

5. External Quilting




I've changed up the priority of my external quilts.  Squared Away is a gift for one of My Girl's college buddies, so it gets moved up to next in line.  My Girl has asked for 3 more quilts as graduation gifts for her grad school buddies. I suspect one of the girls will like Magnificent Mystery, so I'm going to bump that one up too.  

If I can end the quarter with 2 more finished quilts and 2 more projects moved to finished quilt tops, it will have been a really good quarter.  

Wednesday, July 8, 2026

Second Quarter Review 2026: Strategic Progress?

Back in January, I drafted a strategic plan (?) for 2026.  Strategic Plan is probably a gross overstatement of what I actually put together, but it was at least a potential road map for my quilting decisions.  Now that we are in 3rd quarter, I should probably take a look at where I'm at and decide on any adjustments.  

2nd Quarter Strategy

1. Guild BOM: Finish May through October blocks.  Finish Flying geese. 

The May, June and July blocks are all finished.  The flying geese for the alternate border are also all finished.  The instructions are written for the August and September blocks.  I needed to verify the cutting dimensions for some of the pieces for the October block and that got done last week.  So I didn't get everything done, but I'm also not too far off track.  If I put focus on this project in July, I should be back on track before we got too far into third quarter. 

2. Wild and Goosey: Continue as leaders and enders project

All the blue 3.5" blocks were finished last quarter and most of the blocks were sashed.  The hope is this project will be ready for assembly before the end of the year. 

3. Move UFOs to finished quilt tops. 



Three of the 5 UFOs became finished quilt tops: 2026 SAHRR, Magnificent Mystery and Old Town.  Lupine and Laughter only needs two more borders added to be a completed quilt top.  The remaining pieces needed to assemble the blocks for Good Fortune have been cut.  The chain blocks are all finished, but still working on the star blocks.  I didn't get it all done, but at least every project on the plan is farther along. 

4. Walking foot quilting




The plan was to finish off two quilts, but only Chilhowie was finished up. Glowing Hearts has been pulled out of the closet, the batting laid out to relax and I've been contemplating quilting motifs.  So even though it didn't get done, at least there was a bit of progress on it.  Based on how the walking foot quilting has been going, one quilt a quarter seems to be my speed, at least for now.  

5. External quilting




A backing was pieced for the 2025 Inverted Star BOM. Both the backing and the quilt top were prepped for quilting.  I delivered the project to the long armer the first week in July.  So at least that one will be a finished quilt in third quarter. I didn't even touch Chocolate Marshmallow.  It's probably going to go to the bottom of the list as My Girl has picked a few quilts that will be going to college and graduate school friends.  So those will higher priority the last half of the year.  

Second quarter wasn't a total success, but I have learned a lot. I'm doing well at moving projects to finished quilt tops. That will help a lot in clearing out my UFO list. But I'm not doing so hot on either the walking foot quilting or getting quilts ready for external quilting.  It seems one quilt top for each a quarter is about my speed on that part of the UFO process. I'll have to consider if that modifies my strategy for third quarter or not.  At any rate, there's been reasonable progress on all of my "strategies".  Not a bad first half of the year.   

Tuesday, July 7, 2026

To Do List for the Week of 7/7/2026

My last to do list was almost a month ago.  With all the travel to and from Texas along with plans with My Girl, it was hard to assess what I was going to be able to work on. I didn't do so hot on addressing my last to do list, so I just used that one for a couple of weeks.  Even with three weeks, I didn't get to every item. 

To Do List for 6/16/2026

1. 2025 Guild BOM: Finish prepping quilt for quilting ✔
2. Lupine and Laughter: Continue assembling quilt ✔
3. Good Fortune: Continue making main blocks - no progress
4. Celtic Solstice: Cut fabrics to finish blocks - no progress
5. 2026 Guild BOM: Finish block instructions, cut pieces - progress
6. Wild and Goosey: Continue sashing blue blocks ✔

Three check marks and one item with some progress isn't bad considering I was on vacation for 10 days.  My list didn't include working on my butterfly travel embroidery project.  There was lots of progress on that.  That last list was probably a bit ambitious, so I'm going to scale it down just a bit this week.  

To Do List for 7/7/2026

1. Glowing Heart (Sandra Walker): Make backing, piece batting



Glowing Hearts was the quilt along offered by Sandra of MMM Quilts in 2025. This is the next project to be quilted on my home machine.  I have some thoughts about what to do for the back, but I need to see what if what's left over is enough.  I have a piece of batting that is definitely long enough, but is just a bit shy of being wide enough. I can certainly reconfigure the piece to be the right size.  If that gets done this week, I'll count that as good progress. 

2.   Lupine and Laughter (Bonnie Hunter): Add last border




The strips are all cut and pinned for stitching.  This should go pretty quickly and be an easy to do to check off this week.  

3. 2026 Guild BOM: Cut pieces for last 4 blocks

The instructions are written for the last 4 blocks in the block of the month series.  I need to get August's block done pretty quickly, but I'm hoping to finish up the remaining blocks by the end of the month.  Then I can start on quilt assembly. It won't be long before I need to make some progress on the project for 2027.  

4. Good Fortune (Bonnie Hunter): Continue making main blocks

I've not touched this project in the last three weeks, so I'm hoping to get back to it this week and make some progress on finishing up the blocks.  

5. Wild and Goosey (Bonnie Hunter): Finish sashing blues, work on teals



Only 3 blue blocks left to sash and one purple 3.5" block from June left to finish before I can concentrate on making some progress on the teal blocks.  

That's a doable list for this week (famous last words right?).  Linking up with the Quilt Schmilt for To Do Tuesday

Thursday, April 16, 2026

2026 Quilt Making Strategies: Second Quarter Plan

After reviewing my first quarter progress, my second quarter overall strategy won't need to change. But I will need to adjust the project list for the quarter since there is a lot that didn't get finished in first quarter.  

1. Guild BOM: The focus for April is to get the blocks for May, June and July finished. I should probably also finish off the flying geese needed for the borders. Before the end of the quarter, blocks for August, September and October need to have the instructions written and the blocks made. November will be an easy block, so I'll try to get that one done as well. Then I won't have to do anything on this project till 4th quarter.    



2. Wild and Goosey: Continue to use two blocks as my leaders project for the quarter.  

3. UFOs to move to finished quilt tops: The plan is to focus first on the projects that didn't make it to finished quilt tops in first quarter. Since two of those don't need that much work, I'm hoping to work in at least two UFOs from the January plan.  



2026 SAHRR, Magnificent Mystery, Old Town, Lupine and Laughter, Good Fortune

4. Walking foot quilting: I hoping now that I have a designated time to quilt that two quilts will get quilted this quarter. The plan is to tackle the 2 smallest ones on my list.   



Chilhowie and Glowing Hearts

5. External quilting: Since I didn't get one done in first quarter, I'm hoping to get two done in second quarter.  


2025 Guild BOM and Chocolate Marshmallows

If everything gets done, there will be 5 more finished quilt tops and 4 more finished quilts.  That's probably way too ambitious a plan considering that I've already lost half of April.  If there is half as much progress, I'll be happy.  

Friday, January 2, 2026

PHD Report for 2025

Now that 2025 is over, it's time to review the progress on my PHD plan and link up with Ms. P Designs for the PHD Wrap Up report.   Looking back, my 2025 PHD report is probably my worst in the seven years I've participated.  



Lots more starts than finishes this year.  At least I finished one of those new starts this year.  One finish is better than none.  That gives me lots of incentive to get more finished in 2026.  But finishes aren't the whole story, there was a lot of progress on other projects this year. (This is a picture heavy post. I didn't realize just how many projects I had worked on in 2025).  



The Rose Throw is a counted cross stitch project started sometime in the mid to late eighties. I came across this project during a sewing room clean up and reorg.  I'd forgotten how long it takes to make progress on counted cross stitch.  I made a bit of progress this year, but not much.  This one will probably sit in time out all year while I focus my hand stitching efforts on the butterfly embroidery project.  




The blocks for Kate's Choice were finished last year.  All the blocks were quilted this year and I started assembling the quilt as a quilt as you go. The first row is finished.  I'm not a fan of this assembly method, so the project got put in time out. It will get finished in 2026.  That's my first goal for the year.  



 
Normally there's more progress on this project during November and December, but the last time I worked on the Butterfly panel was Thanksgiving.  The embroidery in the third corner is all done and I've started stitching on the 7th butterfly.  This is my travel project.  It will probably see some progress this year, but won't be finished. 
 



On Ringo Lake was the 2017 Bonnie Hunter Mystery.  After 8 years it's finally a finished quilt top.  I've been trying to finish up all my BH mystery quilts. Out of 14, 7 are uncompleted.  Which isn't awful, but still not stellar.  This is one I'm hoping to finish quilting this year.  



It's been slow going on Wild and Goosey (Bonnie Hunter).  This project started in 2019.  I've been making the blocks as part of the Rainbow Scrap Challenge. I'm almost done with the green blocks, but still need lots of blue, purple and teal.  But the quilt is over halfway now. I'd like to finish it this year, we'll see how it's looking by 4th quarter.   




The Simply Sensational Summer Scrap Quilt (Kevin the Quilter) is also a project from 2019.  It came out of time out when I was looking for something to use up a few scraps as my bins were getting full.  It was my leaders and enders project for the first half of the year.  I needed the design wall for something else, so this project got put away.  Not sure when I'll get this one out again.  Hopefully I won't wait another 5 years!   



I joined the local quilting guild in 2023, about midyear if I remember correctly.  A bit late to start the BOM that year, but I did start the 2024 one.  For once, I stayed on track and actually finished the quilt top in time to show at the January meeting.  It's still waiting to be quilted.  I haven't decided to quilt it myself or send it out.  We'll see how some of my smaller and simpler projects work out.  




The Marble Mystery was the 2024 Meadow Mist Designs Mystery.  It's been a finished quilt top for most of the year. This is another project I hope to quilt with the walking foot sometime this year.  


The 2024 Bonnie Hunter mystery was Old Town.  One of my 7 unfinished BH mystery projects. All the blocks are done, I just to need to figure out the borders.  Hopefully that happens sooner rather than later.  




Leading the guild BOM for 2025 was a learning experience.  I've seen several finished quilt tops and it's been such fun to see how everyone has made them their own.  My version still needs to be quilted. One thing about being the lead, you have to keep up!  


The 2025 SAHRR (Quilting Gail) was my only finish for 2025.  This quilt was gifted to My Girl's grad school roommate as a thank you for being such a good one.  The roommate's favorite color is green, so that was picked as the predominant color. I've finished all of the SAHRR quilts that I've started. Fingers crossed that stays true for this year!  



MMM Quilts offers a quilt along in the spring.  I've admired from afar, but decided if I could pull all my fabrics from the stash I'd participate in her Glowing Hearts quilt along.  The background fabric had been in my stash forever without finding a home till this project.  Another quilt top I'm hoping to quilt myself this year.  



I got a late start on the 2025 Meadow Mist Designs Magnificent Mystery.  The September clue is the only one completed, but I do have a good start on the next three. The January clue came out yesterday, so I need to get a start on that. Assembly happens next month.  It would be nice if I had all the component parts done by then.  




Apparently, I'm a glutton for punishment as I agreed to lead the guild's 2026 BOM.  I am finding that the sampler blocks I picked for this year are much easier to cut and assemble. Fingers crossed I can keep up better this year.  


And lastly, Lupine and Laughter was started during the local quilt shops late night sew on New Year's Eve.  I wondered if we'd get the reveal this week. I just checked this week's clue is more pieces. I'm going to make the blocks that use the hourglass pieces and hold off on any of the other clues till I see the reveal. Then I'll figure out what's next. I'm behind, but that seems to be par for the course with a BH mystery.  

One finish and progress on 14 other projects.  That's a lot for one year.  So maybe not as lame a year as I was thinking?  

Wednesday, July 2, 2025

June 2025 PHD Report

Hard to believe we are half way through 2025.  Now that it's July it's time to take another look at my progress with the June PHD report over at Ms. P Designs



 
 

I've not done so well on the finishing up front, but I have been making steady progress on several other projects.  

While cleaning up the sewing room, I found a very old counted cross stitch throw started back in college.  It's been added to my traveling handwork projects.  Not a lot of progress on this, but at least there's been some. I'd forgotten just how much time it takes to do counted cross stitch.   




Another oldie saw some progress in July.  A few more blocks for  Grandmother's/Kate's Choice project were quilted this month.  Just 2 rows left to quilt.  




Wild and Goosey (Bonnie Hunter) also saw a lot of progress this month.  All the orange blocks were sashed as it was the Rainbow Scrap Challenge color for June.  Once those were finished, the remaining red blocks were finished and sashing of those started. 




In May, quilt assembly started for the Simply Sensational Summer Scrap Quilt (Kevin the Quilter).  This month the center was assembled and the first border of the yellow 4-patches was added. 




Clues 6 and 7 for Old Town (Bonnie Hunter) were completed in June.  A good start was made on clue 8.  I'm really hoping to be assembling the quilt blocks by the end of July. 

 


The color for the July Guild BOM block was red. I've already started looking for my sashing options.  August blocks are already under construction as we've got some stuff going on this month, so being ahead will be important.  




Glowing Hearts (MMM quilts) became a finished quilt top.  It's in line for quilting, which I should really focus on this last half of the year.  This was an unplanned project, but it used up some older stash and was a lot of fun to make.  




There has definitely been progress, but other than Glowing hearts none of the other projects have hit a major milestone, so my tracking graphic doesn't look much different than last month's. 




Only Glowing Hearts shows any progress on the bar graph.  Some months are going to be like that.  We'll see what gets done in July, it's going to be a busy month.