Showing posts with label To Do Tuesday. Show all posts
Showing posts with label To Do Tuesday. Show all posts

Tuesday, July 28, 2026

To Do List for the Week of 7/28/2026

We were home most of this week and with the triple digits outside staying in my sewing room seemed to be the best option.  I did get a lot done, it just doesn't feel that way.  

To Do List for 7/21/2026

1. 2025 Guild BOM: Make binding and label - progress
2. Glowing Hearts: Piece batting, prep backing ✔
3. 2026 Guild BOM: Cut fabrics for remaining blocks - progress
4. Good Fortune: Continue to assemble quilt 
5. Wild and Goosey: Continue making teal blocks ✔

Only three check marks, but there was progress on all 5 to dos from last week.  I'll take that.  The goal is progress, and that happened. It's pretty much the same list for this week.  

To Do List for 7/28/2026

1. 2025 Guild BOM: Bind quilt



The binding strips are all cut, they just need to be joined together.  The plan is to use my time at late night sew to get the binding sewn to the quilt.  I have a lot of hand stitching to do for this to get done this month.  

2. Glowing Hearts (Sandra Walker): Prep quilt top and assemble quilt sandwich. 




The quilt backing and the batting are laying on the My Girl's bed waiting for the top to be prepped.  I haven't completely figured out how I'm quilting this one.  Once the quilt sandwiching is done, I'll need to commit to something.  

3. 2026 Guild BOM: Cut fabrics for remaining blocks



I did get the fabrics cut for one of the blocks and actually got that one assembled.  That leaves the last two blocks.  I finally sat down and looked at what I needed for both, so I can optimize my strip cutting. I'm getting low on fabric and I don't want to run out.  

4. Good Fortune (Bonnie Hunter): Continue to assemble quilt. 

The third row is under construction, just 4 left to go. This project will take a back seat until I can finish up the 2025 Guild BOM.  There will be progress I'm sure, but it probably won't be a finished quilt top by the end of the week.  

5. Wild and Goosey (Bonnie Hunter): Continue making teal blocks

I need to cut some additional teal triangles because I'm running a bit low on that color.  I'm just a bit over halfway done with these blocks so I still need lots of scrappy triangles.  

If I can move each to do along a bit, it will have been a good week.  Linking up with the Quilt Schmilt for To Do Tuesday.

Wednesday, July 22, 2026

To Do List for the Week of 7/21/2026

We were in Dallas for the weekend, so I didn't get much sewing done. I worked a lot on the instructions for this year's Guild BOM, so that was my "stitching" activity for the weekend. That wasn't on last week's list, but it needs to get done.  There was some good progress on last week's to do list before we left.  

To Do List for 7/14/2026

1.  Glowing Hearts: Piece batting, start quilting - progress
2.  Guild BOM: Assemble August block ✔
3.  Good Fortune: Continue to work on blocks 
4.  Wild and Goosey: Continue working on teal blocks 

Three check marks and a progress is a good for a week with no weekend sewing room time.  I'm not sure how well this week is going to go.  The upstairs air conditioner quit cooling last night.  My sewing room is upstairs.  Temps are supposed to in the low 90s the next few days, but that's still a bit warm to be sewing in. I can sew at the local quilt shop or set up an alternate location downstairs. It depends on when we can get it repaired. With 100 plus temps the last week, it's not the easiest time to get someone out to look at an air conditioner.  Here's my list for this week, it probably won't all get done, but why not dream big. 

To Do List for 7/21/2026

1.  2025 Guild BOM: Make binding & label

  


I picked the quilt up from the shop yesterday. It needs to be trimmed, plus the label and the binding need to be made.  This quilt is a gift for one of My Girl's college buddies, so I sought her input for the binding.  Since this is a rainbow quilt, we decided on a rainbow binding. I tried to stick with dark to medium fabrics, hence the absence of yellow. I'm pretty sure the binding will get made, but since I won't have access to my big cutting table for an unknown amount of time, I'm not sure when this quilt will get squared up so I can sew on the binding.  

2. Glowing Hearts (Sandra Walker): Piece batting, prep backing




I have two large pieces of batting left over from the piece I used for Chilhowie.  If I sew those together, I'll have enough for Glowing Hearts.  I'll probably get the batting assembled. If I'm out of the sewing room till next week, prepping the quilt back won't happen.  

3. Guild BOM: Cut fabrics for the remaining blocks




August's block was shown at the guild meeting last night, so I can share that.  The plan is to start working on the remaining blocks.  If I can get all the block parts cut while I have each fabric out, it's much more efficient.  It would be nice to finish August with all the blocks finished so I could start quilt assembly.  November will be here before we know it!  

4. Good Fortune (Bonnie Hunter): Continue to assemble quilt top




The first row of blocks have been sashed, but they aren't back up on the design wall yet.  Fingers crossed this will be a finished quilt top by the end of the month.  

5. Wild and Goosey (Bonnie Hunter): Continue making teal blocks

I haven't counted how many more teal blocks I need. A little over half the blocks were made as of last week and only a couple more were finished during the week. So still need quite a few more before all the teal blocks are finished.  

It's an ambitious list. It would be even if I was sure of access to my sewing room. I'll be happy if even a little progress happens for each project. Linking up with the Quilt Schmilt for To Do Tuesday when it's posted. 

Tuesday, July 14, 2026

To Do List for the Week of 7/14/2026

It's been a laid back week.  Summer tends to produce a lot of those, it's too hot to do much outside, so why leave the house.  I didn't complete everything on my to do list, but there was progress on every item.  

To Do List for 7/7/2026

1.  Glowing Heart: Make backing, piece batting - progress
2.  Lupine and Laughter: Add last border ✔ 
3.  2026 Guild BOM: Cut pieces for last 4 blocks - progress
4.  Good Fortune: Continue making main blocks ✔
5.  Wild and Goosey: Finishing sashing blues, work on teals ✔

Three check marks and two with progress is a good week in my book.  Hopefully I can keep up the momentum this week.  

To Do List for 7/14/2026

1.  Glowing Hearts (Sandra Walker): Piece batting, start quilting 




The backing is pieced.  Glowing Hearts was made from a half yard bundle that I won as part of a blog quilt along or give away. There wasn't much left of the bundle, but there was enough with the addition of some of the background fabric to make the backing.  The green strips at the top and bottom were part of the bundle, but I didn't use that fabric in the hearts. Now to piece the batting and prep the top and back for quilting.  That always takes longer then I think it should.   

2. Guild BOM: Assemble August Block





The block needs to be ready for the July meeting, which is a week from today.  So I really need to get busy with the assembly.  If I can get parts of the remaining 3 blocks cut, that would be helpful.  But if I don't get that far, it won't be the end of the world.  

3. Good Fortune (Bonnie Hunter): Continue to work on blocks 





There are a lot of pieces to the main block in this project. Nothing new for a BH mystery quilt, but it does make for some slow going.  There has been progress, but I may be rethinking my approach.  

4.  Wild and Goosey (Bonnie Hunter): 





All the blue blocks are sashed and I've started working on the teal blocks again.  I have just a little over half of the teal and purple blocks needed for this project.  So I'll probably stick with teal until get all that color done and then go back to finish up purple.

A shorter list for this week.  What's left on my UFO list at this point all requires either quilting or block assembly.  Both of those stages tend to be the slowest of the process, so keeping the list short is probably wise.  Linking up with the Quilt Schmilt for To Do Tuesday.

Tuesday, July 7, 2026

To Do List for the Week of 7/7/2026

My last to do list was almost a month ago.  With all the travel to and from Texas along with plans with My Girl, it was hard to assess what I was going to be able to work on. I didn't do so hot on addressing my last to do list, so I just used that one for a couple of weeks.  Even with three weeks, I didn't get to every item. 

To Do List for 6/16/2026

1. 2025 Guild BOM: Finish prepping quilt for quilting ✔
2. Lupine and Laughter: Continue assembling quilt ✔
3. Good Fortune: Continue making main blocks - no progress
4. Celtic Solstice: Cut fabrics to finish blocks - no progress
5. 2026 Guild BOM: Finish block instructions, cut pieces - progress
6. Wild and Goosey: Continue sashing blue blocks ✔

Three check marks and one item with some progress isn't bad considering I was on vacation for 10 days.  My list didn't include working on my butterfly travel embroidery project.  There was lots of progress on that.  That last list was probably a bit ambitious, so I'm going to scale it down just a bit this week.  

To Do List for 7/7/2026

1. Glowing Heart (Sandra Walker): Make backing, piece batting



Glowing Hearts was the quilt along offered by Sandra of MMM Quilts in 2025. This is the next project to be quilted on my home machine.  I have some thoughts about what to do for the back, but I need to see what if what's left over is enough.  I have a piece of batting that is definitely long enough, but is just a bit shy of being wide enough. I can certainly reconfigure the piece to be the right size.  If that gets done this week, I'll count that as good progress. 

2.   Lupine and Laughter (Bonnie Hunter): Add last border




The strips are all cut and pinned for stitching.  This should go pretty quickly and be an easy to do to check off this week.  

3. 2026 Guild BOM: Cut pieces for last 4 blocks

The instructions are written for the last 4 blocks in the block of the month series.  I need to get August's block done pretty quickly, but I'm hoping to finish up the remaining blocks by the end of the month.  Then I can start on quilt assembly. It won't be long before I need to make some progress on the project for 2027.  

4. Good Fortune (Bonnie Hunter): Continue making main blocks

I've not touched this project in the last three weeks, so I'm hoping to get back to it this week and make some progress on finishing up the blocks.  

5. Wild and Goosey (Bonnie Hunter): Finish sashing blues, work on teals



Only 3 blue blocks left to sash and one purple 3.5" block from June left to finish before I can concentrate on making some progress on the teal blocks.  

That's a doable list for this week (famous last words right?).  Linking up with the Quilt Schmilt for To Do Tuesday

Tuesday, June 16, 2026

To Do List for the Week of 6/16/2026

Last week was a good one for progress, it's just that most of that progress was just on two projects.  But I did a bit on everything that was on my list.  


To Do List for 6/8/2026

1. 2025 Guild BOM: Prep quilt top for quilting - progress

2. Chilhowie: Continue quilting ✔

3. Lupine and Laughter: Continue assembling quilt ✔

4. Good Fortune: Continue making blocks ✔

5. Wild and Goosey: Continue sashing blue blocks ✔


Most of the week was spent on Chilhowie and the 2025 Guild BOM projects. Chilhowie is a finished quilt, I just haven't had a chance to get final glamor shots for it. That will happen today. A finish always makes one feel like they've been pretty productive. Hopefully I can carry that momentum into this week's to do list.


To Do List for 6/16/2026

1. 2025 Guild BOM: Finish prepping quilt top for quilting



    

Giving the quilt top a good pressing and removing the loose strings always takes time, but it's worth doing.  I took this photo so I wouldn't forget to get one of the prep work.  Since this was taken, I've moved on to the last row of blocks.  It's been pressed and seen a pass of the lint roller, I still need to deal with some loose threads.  I'm hoping to get this finished up and delivered to the long arm quilter tomorrow. Fingers crossed this will be finished in July.  

2. Lupine and Laughter (Bonnie Hunter) Continue assembling quilt. 




Just two rows left to assemble and then it will be time for borders. What looks like black is actually a very deep purple.  I'm pretty happy with how this one is coming together.  I'm hoping this is a finished quilt top by the end of the month.  

3. Good Fortune (Bonnie Hunter): Continue making main blocks




I finished all the chain blocks and got started on finishing up the main block.  There's a lot of HSTs and stitch and flip corners for this block so it's been slow going, but it is going.

4. Celtic Solstice (Bonnie Hunter): Cut fabrics needed to finish blocks

I found the project box and looked at the finished blocks, but didn't really look very closely at what pieces had already been cut. I don't like to just stand and cut, so I'll work that in with my sewing time. 

5. 2026 Guild BOM: Finish block instructions and cut pieces for blocks

I have block instructions written for August and September.  I've started on the instructions for the October block.  I need to play with some fabric scraps to be sure I've got the pieces sized right for the October block before I finish those instructions.  The block for July gets shown at the guild meeting tonight, so I need to get going on August pretty quickly.  

6. Wild and Goosey (Bonnie Hunter): Continue sashing blue blocks

This has been a slow process as I've been using this as my leaders and enders project. But there has been progress, I just didn't get a picture this week.  

A longer list then I've had recently, but most of it is prep stuff so I can keep moving along with some of the older projects.  If I don't get to all of it, that's OK.  It helps me to see where I'm going next.  Linking up with the Quilt Schmilt for To Do Tuesday

Tuesday, June 9, 2026

To Do List for the Week of 6/8/2026

My weekend wasn't as productive as normal, but I certainly made up for it during the week.  I finished the to do list and a bit more.  

To Do List for 6/2/2026

1.  2025 Guild BOM:  Prep back for quilting ✔

2.  Chilhowie: Continue quilting ✔

3.  Lupine and Laughter: Continue working on main blocks ✔

4.  Wild and Goosey: Continue sashing blue blocks ✔


A good week on the progress front.  I'm hoping for the same with this week's to do list. 


To Do List for 6/9/2026

1.  2025 Guild BOM: Prep quilt top for quilting




The backing is pressed and de-threaded.  The quilt top isn't going to go quickly.  I suspect it will take me most of next weekend to get it prepped.  

2. Chilhowie (Bonnie Hunter): Continue quilting




The cross hatching is done.  After a consultation with my late night sewing buddies, I'm going to move on to quilting the borders this week.  I'm hoping to have a completed quilt soon. 

3. Lupine and Laughter (Bonnie Hunter): Continue assembling quilt

Having two late night sewing sessions really helped move the main blocks along for this quilt.  I'm going to cut the border strips so those are ready to sew.  This should be a finished quilt top before the end of the month.  

4. Good Fortune (Bonnie Hunter): Continue making blocks 




Working on this project wasn't in last week's list.  But after making such good progress on Lupine, I needed some block construction to work in between assembling the rows for the other project.  After yesterday's photo of the black and purple blocks, I thought these were done. Nope, still need to make another 4 blocks.  But that's not too bad. There should be progress on main blocks this week too. 

5. Wild and Goosy (Bonnie Hunter): Continue sashing blue blocks  



 

These blocks are my current leaders and enders project. So it's been slow going.  There will be 16 sashed blocks once all of the flying geese units have been sashed, so not quite halfway there.

Fingers crossed this week is as good as last week on the progress front.  Linking up with the Quilt Schmilt for To Do Tuesday.  

Tuesday, June 2, 2026

To Do List for the Week of 6/2/2026

I didn't get much done during the week, but once we got to the weekend, there was a lot of progress in the sewing room.  A fully checked off to do list was the result. 

To Do List for 5/26/2026

1. 2025 Guild BOM: Make backing ✔
2. Chilhowie: Continue quilting ✔
3. Lupine and Laughter: Continue working on main blocks ✔
4. Good Fortune: Pull project box, assess status ✔
5. Wild and Goosey: Continue sashing blue blocks ✔

It was definitely a more productive week than I expected it to be.  Hopefully, I can do as well this week.  

To Do List for 6/2/2026

1.  2025 Guild BOM: Prep back for quilting

The back needs to pressed and any loose threads removed. It would be a good idea to run the vacuum in the sewing room before I start that process.  

2. Chilhowie (Bonnie Hunter): Continue Quilting



Half the quilt has the second set of diagonal lines quilted.  Still half left to do.  Rather than adding another set of diagonal lines, I may just sew another set of lines from edge to edge.  We'll see how it looks once all the diagonal quilting is done.  I know what I'm quilting in the first narrow border. Still haven't figured out what goes in the last border.  

3. Lupine and Laughter (Bonnie Hunter): Continue working on main blocks




The main blocks are slow going, but I'm starting to pick up speed as I get more of the block components made.  

5. Wild and Goosey (Bonnie Hunter): Continue sashing blue blocks

The sashing has been slow going as I'm sewing those blocks as my leaders and enders.  I may change my strategy there. 

So that's my list for this week.  Linking up with the Quilt Schmilt for To Do Tuesday.  

Wednesday, May 27, 2026

To Do List for the Week of 5/26/2026

My reading time encroached into my sewing time this last week.  I'm sure part of the reason is that the stairs up to the sewing room haven't been fun to navigate with my knee giving me fits. So it takes a bit more motivation to head that direction.  Thankfully, I was in the sewing room enough to make good progress on last week's to do list. 

To Do List for 5/19/2026

1. 2025 Guild BOM: Make backing - progress
2. Chilhowie: Continue quilting ✔
3. Lupine and Laughter: Continue working on A blocks 
4. Wild and Goosey: Continue sashing blue blocks 

Definitely not a bad week even with the reduced sewing time.  What does this week look like. More of the same with one new addition as I'm finding it hard to just work on one quilt at a time.  

To Do List for 5/26/2026

1. 2025 Guild BOM: Make backing



The pieces for the backing are cut, I just need to sit down and stitch them together.  

2. Chilhowie (Bonnie Hunter): Continue Quilting



Quilting of Chilhowie is moving along.  I'm finally getting a better handle on how to handle a large quilt on my sewing machine.  I'm getting better at keeping the lines straight and the stitching even. I'm debating if I need to go back and add one more set of lines in each direction.  The space between the stitching lines is 4", that's the maximum recommended for the batting. Is that going to be enough?  

3. Lupine and Laughter (Bonnie Hunter): Continue working on main blocks.




Construction of the main block has been pretty slow.  I decided to paper piece the star points. You need 8 for each block, so that's been the slow part of the process.  At least I can see visible progress.  

4. Good Fortune (Bonnie Hunter): Pull project box, assess status




Good Fortune is the 2018 Bonnie Hunter mystery.  Looking at my records I haven't worked on it since February of 2019. Based on the mock ups found in my EQ files, I'm about half way done with the blocks.  Not sure what's in the project box, I suspect the next step will be to cut more fabric.  
 
5. Wild and Goosey (Bonnie Hunter): Continue sashing blue blocks

I haven't made a lot of progress with sashing the blocks. It's been slow but steady progress, which is fine for now.  

That's my list for this week.  Hard to believe this is the last list for May.  This month certainly went fast.  June probably will too.  It always seems like the year moves faster the closer you get to the end of it.  Linking up with the Quilt Schmilt for To Do Tuesday.  

Wednesday, May 20, 2026

To Do List for the Week of 5/19/2026

The to do list post is a bit late this week. I had an early morning appointment yesterday, followed by our gym workout, then a trip to Wally World as we call it.  It was time for lunch by the time we got home. When I did get back to the computer in the afternoon, I needed to make sure the guild block of the month instructions were ready to go as yesterday was meeting day.  I just didn't get around to writing a blog post.  

I did pretty well with last week's to do list.  

To Do list for 5/12/2026

1. 2025 Guild BOM: Make backing - progress
2. Chilhowie: Continue quilting ✔  
3. Lupine and Laughter: Work on A blocks ✔
4. Wild and Goosey: Continue sashing blue blocks ✔

Check marks on three out of 4 items and progress on the 4th is a pretty good week.  We'll see how this week goes, I have more appointments then I normally do. 

To Do List for 5/19/2026

1. 2025 Guild BOM: make backing



The 2025 BOM is a big quilt, it needs almost 6 yards of backing fabric.  I found this older Connecting Threads fabric in my stash. I have 7 yards of it.  So that should work. I've started cutting the pieces for the backing, it should be assembled before next week.  

2. Chilhowie (Bonnie Hunter): Continue quilting



The plan is to use the walking foot to quilt straight lines along the diagonals of the quilt.  I've finished all the lines along one diagonal. I'll start on the lines from the other diagonal today.  

3. Lupine and Laughter (Bonnie Hunter): Continue working on block A 

I've added one block to the wall since Monday, so no photo.  Hopefully, I'll have time to sew this weekend and can get all these blocks done.  

4.  Wild and Goosey (Bonnie Hunter): Continue sashing blue blocks

This has been slow moving as I'm sashing the blocks as my leaders and enders project. Only 2 blocks completely sashed. I may have to make this a full task and start using the purple blocks as my leaders project.  

That's my list for this week. Pretty much the same as last week.  The 2025 BOM and Chilhowie should drop off in a couple of weeks.  Then I'll have to figure out what projects come next.  

Linking up the Quilt Schmilt for To Do Tuesday.  

Tuesday, May 12, 2026

To Do List for the Week of 5/12/2026

My back has been slowly getting better. Bending is still problematic, but otherwise I'm mostly pain free.  My therapy has included cycling, walking and sewing.  Movement is the best thing for the back and with all the walking between rooms I did working on Chilowie, I moved a lot!  It's a blessing that the sewing room was one of the places I could go and not hurt. That was really good for last week's to do list. 


To Do List for 5/5/2026

1.  Old Town: Work on borders ✔

2.  Chilhowie: Sandwich quilt and start marking 

3.  Lupine and Laughter: Work on A blocks 

4.  Wild and Goosey: Finish blue blocks, start sashing 


It was a good week, 4 for 4 on the to do list. Fingers crossed I can do as well with this week's list. 


To Do List for 5/12/2026

1. 2025 Guild BOM: Make backing




My Girl has asked me to finish this quilt for one of her college buddies.  This one is a bit big for me to quilt on my sewing machine. Plus, having some professionally quilted will help me make a dent in the number of to be quilted projects.  I found a reasonable backing fabric in the stash.  So I need to get some measurements and get started on sewing the back up.  It also needs a different name. My Girl is usually pretty good at coming up with good names for the quilts that go to her friends.  

2. Chilhowie (Bonnie Hunter): Continue quilting 




I'm using painters tape to mark my lines. The first two lines were not perfect. I may or may not go back to fix them. I'll see how noticeable the wobbles are once all the quilting is done.  At least I got started. It's slow going at the moment. I'm hoping it gets faster with more practice.  

3. Lupine and Laughter (Bonnie Hunter): Work on A blocks



I was reading the pattern last night to get started on what I thought was block B.  My block IDs are switched from Bonnie's.  That's OK, as long as I know which is which.  I've started on the "framing blocks" for the first block.  That purple may be way to dark for the rest of the quilt, but it's what I've cut, so we'll see how it develops as the blocks come together. 

4. Wild and Goosey (Bonnie Hunter): Continue sashing blue blocks




Only 1 block sashed so far, 63 left.  This makes a great leader and ender project.  

Another short list.  But it is in line with my strategy was for the year.  I wanted to keep the list to 4 to 5 to dos during second and third quarter.  The focus will be on getting quilts to finished over the next few months.  

Linking up with the Quilt Schmilt for To Do Tuesday.  

Tuesday, May 5, 2026

To Do List for the Week of 5/5/2026

Hard to believe it is already May. I completely missed that yesterday was "May the 4th Be With You" day.  Today is Cinco de Mayo, so happy holiday if you are of Mexican heritage. Mother's Day is this weekend (I have no idea what to get my mother).  

The end of April, beginning of May were pretty productive as my to do list shows for last week shows. 

To Do List for 4/28/2026

1. Guild BOM: Finish July block ✔
2. Magnificent Mystery: Finish borders 
3. Chilhowie: Prep top and back for quilting 
4. Lupine and Laughter: Work on A blocks
5. Wild and Goosey: Continue making blue blocks 

Definitely a lot of progress on the to do list last week. Now that Magnificent Mystery is a finished top and the Guild BOM is caught up for a few months, I can add something back to the list and it will still be shorter then last week's list. 

To Do List for 5/5/2026

1. Old Town (Bonnie Hunter): Work on borders





I finished assembling the quilt top back in December of last year. It got put away to concentrate on all the new projects that started in December and January.  All it needs is the borders.  I spent some time in Electric Quilt yesterday and finally decided on fabrics and layout.  I'm excited to get this one to finished quilt top.  

2. Chilhowie (Bonnie Hunter): Sandwich quilt and start marking





The top, batting and backing are all prepped.  With my back, I can't crawl around on the ground, so I'm going to have to take the sandwich to the quilt shop and assemble it there.  There is a big table in the back that should make that a lot easier.  If all I do is get the sandwich made this week, I'm good with that.  

3.  Lupine and Laughter (Bonnie Hunter): Work on A blocks



 
In the project bag were 5 finished block A's and this partially assembled one. My plan was to make 3/4 of the blocks, I think.  I need to pull out my notes and confirm that. The plan is to work on this one till it's finished quilt top.  

4. Wild and Goosey (Bonnie Hunter): Finish blue blocks, start sashing

 


Just one blue block left to finish. Then I'll need to lay out all the blocks in groups of four and decide which block goes where.  Sashing goes fast so I'm hoping to have these all made into 7.5" blocks by the end of the month.  

This week, my to do list is all Bonnie Hunter quilts, three mysteries (2024, 2022, and 2025) plus one Rainbow Scrap Challenge project (2019).  I've started 14 mysteries, finished 7 of those, and 3 are quilt tops.  So 4 are still in the block making stage (well 3, Old Town just needs borders). 

That's my to do list for this week. Linking up with The Quilt Schmilt for To Do Tuesday.    

Tuesday, April 28, 2026

To Do List for the Week of 4/28/2026

Storm season has been brutal in Oklahoma this year.  I have family in Enid (they are fine).  There were tornadoes just west of us Sunday night. We were up late waiting to see if the tornado warning was going to cross the county line. No point going to bed if you have to make a run for the storm shelter just as you get to sleep. More rain/storms are in the forecast for today. Hopefully those will be mainly just rain, not strong storms.  

The severe weather hasn't affected my sewing time too badly.  I did pretty well with checking off my to do list for last week. 

To Do list for 4/21/2026

1. Guild BOM: Finish June and July blocks - progress
2. Magnificent Mystery: Finish assembly, decide on borders ✔
3. Chilhowie: Make backing ✔
4. Lupine and Laughter - no progress
5. Wild and Goosey: Continue making blue blocks ✔

Definitely not a bad week. My plan had been to finish the BOM blocks before I started back up on Lupine and Laughter.  I didn't get that far this week. Still it wasn't a bad week on the progress front. Hopefully this week will be better. 

To Do List for 4/28/2026

1. Guild BOM: Finish July block

The July block is under construction, I just ran out of time this week to get it finished. We went to visit my mother yesterday, so I missed one day of sewing time.  

2.  Magnificent Mystery (Meadow Mist Designs): Finish borders




The rows are all sewn together. I'm really happy with how this project came together.  Cheryl didn't include borders in her version, my plan is to add a very narrow dark brown border and then a wider teal final border.  That should be doable this week.  

3. Chilhowie (Bonnie Hunter): Prep top and back for quilting




The plan was to use the left over border blocks and stash fabrics to make the backing.  The paisley is left over from a long ago sampler quilt. It has the orange and teal from the quilt top.  The dark brown is a Connecting Threads fabric that's been in the stash forever that matches the dark brown background of the paisley. You can see from the photo the backing still needs a good pressing. The back is easy to prep, but the tops always take at least a day to prep. Next week  will be sandwiching and marking.  

4. Lupine and Laughter (Bonnie Hunter): Work on A blocks

Since the BOM blocks and Magnificent Mystery are just about done, I should get back to this project before the end of the week. 

5. Wild and Goosey (Bonnie Hunter): Continue making blue blocks

Just 3 blue 3.5" blocks left to make.  Once I have the last set of 4 finished, it will be back up on the design wall to decide on the final block sets and the start sashing the blue blocks together.  Since the RSC color for May is orange, I'll keep on working on the blue blocks.  If I get them all sashed before the end of the month, I'll switch to working on the purple blocks.  

That's my list for the week.  I'm hoping to drop off a couple of projects and bring back some older projects that need to be moved along. My plan is to not start any new projects until the next Meadow Mist Designs mystery quilt starts up in early fall.  Normally I link up with the To Do List post over at the Quilt Schmilt. There is no linky party posted just yet, I'll link up once it's up.  

Tuesday, April 21, 2026

To Do List for the Week of 4/21/2026

The storms put a hitch in my stitching time last week.  I still got a lot done, but didn't complete all of my to dos from last week. 

To Do List for 4/14/2026

1. 2026 Guild BOM: Work on May, June, July and Dec blocks ✔
2. SAHRR: Add final border 
3. Magnificent Mystery: Finish half blocks, start quilt assembly 
4. Chilhowie: Piece backing, start prepping for quilting - progress
5. Wild and Goosey: Continue working on blue blocks 

It was a good week even though I didn't get as much done on Chilhowie as I wanted.  There's always this week.  

To Do List for 4/21/2026

1. Guild BOM: Finish June and July blocks





All the flying geese for December are finished. The May block is ready for guild meeting tonight.  The pieces for the June and July blocks are cut, they just need to be assembled. So I'm on track with this project.  

2. Magnificent Mystery (Meadow Mist Designs): Finish assembly, decide on borders.





I've made enough progress on assembly that I should be able to finish that this week.  I'm pretty sure I'm going to add a simple border, but just not sure which fabric to use.  

3. Chilhowie (Bonnie Hunter): Make backing





I work on quilting projects on Wednesday and Thursday.  I didn't get much sewing time last Wednesday because of the storms. The blocks for the borders didn't get used on the quilt top, so I decided to use those on the back.  The plan is to get all this blocks sewn into one strip that will separate one backing fabric from the other.  I'm trying hard to use left over stash or older fabrics that haven't made their way into projects yet for my backings.  

4. Lupine and Laugher (Bonnie Hunter): Work on A blocks

I've not touched this project since January. It's going to take a bit to get back into a groove on what I was doing.  

5. Wild and Goosey (Bonnie Hunter): Continue making blue blocks

Just a few left to make. Hopefully those get finished before the end of the month.  

I'm hoping for a productive week. It would be nice to get back to some of the older projects on my UFO list.  Linking up with the Quilt Schmilt for To Do Tuesday.