To Do List for 2/24/2026
1. Kate's Choice: Work on borders ✔
2. SAHRR: Start 6th prompt ✔
3. Scenic Waypoint: Assemble blocks - progress
4. Magnificent Mystery: Continue block assembly ✔
5. Wild and Goosey: Continue sashing green blocks ✔
I didn't check off all of my to do list, but at least there was progress on every project. My to do list hasn't changed much since the first of the year. It's going to be pretty much the same this week.
To Do List for 3/3/2026
1. Kate's Choice: Finish borders
The fabric strips are cut for the sashing and the borders. The top border is quilted, but hasn't been cut to size yet (I started with the border pieces being a bit longer to account for any loss the quilting causes). I'm hoping to finish quilting the bottom border and get both attached this week. I'm excited to get at least one quilt off my UFO list.
2. Scenic Waypoint (Meadow Mist Designs): Finish block assembly, start quilt assembly
All the blocks for rows 1 and 2 are finished. A couple of blocks for row 3 are done. The deadline for the quilt parade for this quilt along is March 12th. I have a lot of stitching to do before then. Can I get this to finished quilt top by then?
3. Magnificent Mystery (Meadow Mist Designs): Finish block assembly, start quilt assembly
The deadline for the quilt parade for this mystery quilt along is March 11th. Not sure I can move both this one and the one for Scenic Waypoint to finished quilt tops by the due dates. The more likely scenario is that I don't make either.
4. SAHRR (Quilting Gail): Work on final border, quilt assembly
With all the effort going into Scenic Waypoint and Magnificent Mystery it's good that I have a few weeks before the final quilt parade for the SAHRR. What gets done, gets done this week on this project.
5. Wild and Goosey (Bonnie Hunter): Work on blue blocks
The RSC color is red, but as I've finished all the red blocks for this project, I'm going to pick back up on the blue ones.
6. Guild Challenge Block: Make at least one block
The guild challenge block for this year is one for Heartland Quilt Network. This group creates patriotic quilts for veterans. Several guild members sew with this group weekly. I've pulled some scrap strips from my bins. We'll see how far I get with it this week.
That's the list for this week. If I can make a lot of progress on it, several projects should hit significant milestones. It probably won't happen this week, but surely by the end of the month my list will look a bit different. Fingers crossed on that front. Linking up with the Quilt Schmilt for To Do Tuesday.



6 comments:
Very smart to make the borders for Kate's Choice a bit longer so you can trim them down after quilting. Good luck getting quilts assembled; you are at big transition phases for a lot of projects right now!
Two close deadlines make it a little more challenging. I'm glad we have some time to finish the SAHRR. I still have one goal from last month to do. I'm glad we have a warmer color for the RSC!
Looks like you've really been making good progress on multiple projects, Kate! That Scenic Waypoint block is really pretty. I haven't worked on my qayg project all this month - hoping to get back to it in March!
I haven't even made a list because I know I wouldn't stick to it. Good luck in keeping up with yours.
I think you could make both of thte mystery quilt parades but they would probably have to remain your top (perhaps sole?) focus to do so. Just map out what you need to do daily to get there and see if that's doable. Then the other projects can wait until those are done to get the time in the focus spot.
If the mapping does not prove it's possible to make the deadline, no matter we will all look forward to your reveal of them whenever it comes!
Love your scenic waypoint quilt blocks! For a moment I thought you had a spool block in with the hour glass blocks and was thinking cool. Then realized it was a note. Silly me. Love your colors!!!!!
Post a Comment