Pages
Tuesday, February 27, 2024
To Do List for the Week of 02/27/2024
Sunday, February 25, 2024
2024 Stay at Home Round Robin: Week 5
Stitching Stuff: Week 8 of 2024
It's not been the best week. What I thought was a pinched nerve, isn't. The doctor isn't sure what's wrong, but it's gone from bad to worse. I wasn't able to walk at all Friday. Mobility improved throughout the day on Saturday. So I worked on some embroidery stitching both days as I couldn't navigate the steps up to my sewing room. With that I was able to maintain my stitching time for the week.
- 15 minute days/week = 7/7 days
- 15 minute days/February = 24/24 days
- 15 minute days/2024 = 55/55 days
- Success rate = 100%
Powered by... Mister Linky's Magical Widgets.
Tuesday, February 20, 2024
To Do List for the Week of 02/20/2024
It's not been the best week. The pinched nerve in my leg is slowly improving, but I'm still pretty slow and sore. Add to that My Guy has a stomach virus. The only good thing out of that is I've been sleeping on the couch due to my leg and apparently missed out on the virus. Thankfully my stitching time hasn't been impacted too badly and I did pretty well with last week's long to do list.
To Do List for 02/12/2024
1. 2024 SAHRR: Finish border #4 ✔
2. Betty: Start assembling quilt ✔
3. Guild BOM: Make January and February blocks - progress
4. Malted Mystery: Finish the February clue - progress
5. Wild and Goosey: Continue making red blocks ✔
6. Indigo Way: Continue assembling blocks as leaders/enders ✔
Four check marks with progress on the remaining to do items is a really good week. Hopefully I can do as well this week.
To Do List for 02/20/2024
1. 2024 SAHRR (Quilting Gail): Finish border #5
Grad girl picked a very challenging block for this week. It looks really cool, but I may not finish this week. We'll just have to see how that goes.
2. Betty (Meadow Mist Designs): Finish assembling quilt.
It took a bit to decide which blocks went where. Two rows are sashed and sewn to another row of sashing. I needed the design wall for the 2024 SAHRR, so I took Betty down and just didn't get it back up to take updated photos.
3. Guild BOM: Make February Block
I finished January block. All the pieces are cut out for the February block. It shouldn't take too long to get the block put together.
4. Malted Mystery (Meadow Mist Designs): Finish the February clue.
I put the last border strip together without the sashing pieces and didn't realize it till I tried to add it to the rest of the quilt. I spent the last of my sewing room time last night doing the unsewing and pinning on the sashing pieces. That should all go together this week.
5. Wild and Goosey (Bonnie Hunter): Continue making red blocks
I've done well on the W&G blocks this month. I should have at least 10 completed by the end of the month.
6. Indigo Way (Bonnie Hunter): Continue making blocks as leaders and enders.
I finished all the corner blocks, now I'm working on finishing off the setting triangle blocks.
That's my list for this week. Hopefully the leg will continue to improve and I can continue to stitch. Linking up with The Quilt Schmidt: For the Love of Fabric for To Do Tuesday.
Sunday, February 18, 2024
2024 Stay at Home Round Robin: Week #4
No winter precip this weekend, but it was cold. So it was definitely a hang out in the sewing room weekend. The main priority was to finish the prompt for week #4 of the SAHRR posted by Songbird Designs. You could choose from square in a square blocks or blocks set on point.
I went with the square in a square blocks around two corners. It's been fun to watch this quilt come together. The prompt for border #5 will be posted over at Quilting Gail's on Monday morning. I'm looking forward to seeing what's next.
In addition to linking up with Songbird Designs, I'm also linking up with Patchwork & Quilts and Monday Design Wall.
Stitching Stuff: Week 7 of 2024
Winter came back in full force on Friday. It's just been cold, no winter precip in the forecast. It's definitely been stay in and sew weather. So it's been another good week on the finding time to stitch front.
- 15 minute days/week = 7/7 days
- 15 minute days/Feb = 17/17 days
- 15 minute days/2024 = 48/48 days
- Success rate = 100%
1. Julie in GA 2. Gretchen 3. maggie f 4. Karen 5. Quilting Gail | 6. DonnaleeQ 7. Andrée 8. Shelina 9. Deb in Canada 10. Bonnie in Va | 11. Frédérique 12. Amanda 13. dreamworthyquilts 14. Celine |
Powered by... Mister Linky's Magical Widgets.
Saturday, February 17, 2024
Week 103 Photo Challenge: Stairs
Wednesday, February 14, 2024
Photo Play 2024: January Summary
Tuesday, February 13, 2024
To Do List for the Week of 02/12/2024
Sunday, February 11, 2024
2024 Stay at Home Round Robin: Border #3
This week I had hoped to finish off the third round of borders for the SAHRR before Sunday evening. I was doing so well Friday on getting my triangle borders pulled together. The first set of border blocks went up on the design wall just before dinner on Friday. Something didn't look right. The diamond tips don't line up.
I'm paper piecing these diamonds. Note that a diamond is made up of two equilateral triangles and four isosceles triangles. These look wonky because the center diamonds aren't made from two equilateral triangles. I didn't draw the block correctly in EQ and didn't catch it till these were up on the design wall. Why didn't I see it in my EQ quilt mock up? I used triangle in a square blocks to design the border and decided that paper piecing the blocks as diamonds would be faster. It would have been if I'd caught that drawing error before I started making the blocks. Lesson learned, double check my measurements in EQ before I print my paper templates.
By Saturday evening, I had redrawn the block, reprinted the paper pieces, cut the replacement fabric pieces and finished the first set of blocks. It took me the rest of Sunday to finish all 4 borders.
The quilt top is now 34" x 36". I'm happy with how this quilt is coming together. Grad Girl has been giving me input on fabric selections and a thumbs up on each border mock up in EQ before I start making the blocks. It's not too hard to collaborate via text. The prompt for border #4 should be posted Monday morning over at Songbird Designs.
Linking up with The Darling Dogwood for Round #3 of the SAHRR and my typical Monday morning linky parties for Design Wall Monday and Patchwork & Quilts.
Stitching Stuff: Week 6 of 2024
The second week of February has been a mixed bag weather wise. It was warm enough for some hiking and photography before getting cool enough that hiding in the sewing room was really the only option. Even with the days spent out on the hiking trail, my stitching time for the week didn't suffer.
- 15 minute days/week = 7/7 days
- 15 minute days/Feb = 10/10 days
- 15 minute days/2024 = 41/41 days
- Success rate = 100%
1. maggie f 2. Gretchen 3. Julie in GA 4. Karen | 5. DonnaleeQ 6. Frédérique 7. Melisa- Pinker n' Punkin Quilting 8. Dq at Dreamworthyquilts | 9. Quilting&Learning 10. Bonnie in Va 11. Carol @QuiltSchmilt |
Powered by... Mister Linky's Magical Widgets.
Saturday, February 10, 2024
Week 102 Photo Challenge: Leaves
Tuesday, February 6, 2024
To Do List for the Week of 02/06/2024
The beginning of February ushered in some warmer temps, so afternoon walks have been taking some of my afternoon sewing time. Even with that added activity, I did pretty well with my long to do list from last week.
To Do List for 01/30/2024
1. 2024 SAHRR: Make border #2 ✔
2. Betty: Assemble 5 blocks ✔
3. Indigo Way: Continue assembling blocks ✔
4. Malted Mystery: Finish Jan clue, start Feb - progress
5. Scrappy Butterflies: Send out for quilting ✔
6. Wild & Goosey: Finish green blocks, start red blocks ✔
7. Chilhowie: Continue as leaders and enders project ✔
Check marks on six out of 7, with progress on the 7th is a really good week. I've been prioritizing the current quilt along projects, so those get done first. Progress on the other projects has consequently been slower, but there is still progress.
I've been contemplating my strategy for this week. Now that Scrappy Butterflies is out for quilting, do I pull out another quilt to be finished and add that to the rotation? With two on going quilt alongs, it's probably best that I concentrate on what's currently up on the design walls. I can concentrate on finishing up some of my older projects later in the year. A to do list with seven items is just a bit long for comfort. So here's this week's to do list.
To Do List for 02/06/2024
1. 2024 Stay at Home Round Robin (Quilting Gail): Finish border #3.
The prompt for the third border is to use triangles. I've got my design worked out. But I need to pick an orange and a black for those triangles.
2. Betty (Meadow Mist Designs): Assemble last 5 blocks.
The last 5 went together pretty quickly. Just 5 left to construct for this week. Then it's on to quilt construction.
3. Indigo Way (Bonnie Hunter): Continue assembling blocks.
Not a lot of progress on this project, but there has been some. I'd like to get this to finished quilt top and off the design wall. Since all the blocks are laid out on the design wall and ready to stitch, it just makes sense to keep working on this project.
4. Malted Mystery (Meadow Mist Designs): Work on the February clue.
January clue is done. It doesn't look square, but it is. This design wall is behind my cutting table and it's hard to get something laid out straight on it. The February clue is out, I'm really excited to get the new rows added and see how my version comes out.
5. Wild and Goosey (Bonnie Hunter): Work on red blocks.
One red block is already finished and a second not far off finished. I've been working on 2 at a time as I stitch on my other projects.
6. Chilhowie (Bonnie Hunter): Finish last block.
The 9th block is almost finished. Once it's done, this project is going to go into a project box for a bit. The sashing is pieced and it would help to have the blocks on the design wall while working through that process. Chilhowie has been my leaders and enders project. I will probably start working on Indigo Way as my leaders and enders till I can get it off the design wall.
So that's my list for this week. A bit shorter than last week's, which I hope means better progress on what's left on it. Linking up with The Quilt Schmilt: For the Love of Fabric for To Do Tuesday.
Sunday, February 4, 2024
2024 Stay at Home Round Robin: Border #2
It's been a cold and rainy day, perfect for lots of sewing time. My focus today was to finish the second border for this year's SAHRR. Last week's prompt was from Anja Quilts, using just two colors do anything you like for the second border. I decided to go simple.
The rail fence borders were pretty easy, but those 9 patches with the 1" orange strips weren't as easy. I didn't do too badly at matching the corners up with the sides, but even being just a tad off shows up with those bold colors. Grad Girl likes it, which is all that matters. I'm looking forward to seeing what guidance we get for border 3 on Monday morning. The quilt is just 26" x 28", I'm going to need to use some larger blocks in the next 3 rounds to get this to a good couch sized quilt.
Linking up with the 2024 SAHRR Round 2, Design Wall Monday, and Patchwork & Quilts.
Stitching Stuff: Week 5 of 2024
Week 5 of 2024 means it's February. Day one and two were very nice, but now we are back to a chilly rain. That usually means more stitching time for me, but with the nice weather, walks and photography took over a couple of afternoons. Saturday morning was science fair, so my stitching time took a hit, but I still got in at least my 15 minutes each day.
- 15 minute days/week = 7/7 days
- 15 minute days/Jan = 31/31 days
- 15 minute days/Feb = 3/3 days
- 15 minute days/2024 = 34/34 days
- Success rate = 100%
1. Gretchen 2. maggie f 3. Karen 4. DonnaleeQ 5. Julie in GA | 6. Jennifer in Indy 7. Dq at Dreamworthyquilts 8. katie z. 9. Bonnie in Va 10. Frédérique | 11. Deb in Canada 12. Quilting Gail 13. amanda 14. Celine 15. Andrée |
Powered by... Mister Linky's Magical Widgets.