So my weekend stitching plans didn't work out so well. There were two goals for the weekend, get caught up on the Meadow Mist Designs Mosaic Mystery blocks and get the Twinkle star blocks sewn together (that was the September One Monthly Goal). Neither happened, but at least there was progress. I've managed to get about half of the house blocks done for the Mosaic Mystery September Link Up.
Mosaic Mystery The Meadow Mist Designs 2019 Mystery Quilt Along |
The next clue comes out on Thursday. My Guy is leaving on a business trip today, so I'm hoping there will be time the next couple of nights to get all caught up on these blocks before the next clue comes out.
Getting the Twinkle Star blocks all sewn together ready for borders was this month's One Monthly Goal. But I didn't plan very well, so that didn't happen. I needed to get Storm at Sea off the design wall, which happened a bit later in the month than anticipated. Secondly, I didn't think about all the matching seams that would need to be pinned.
There are 5 places were the seams need to match. So that's a lot of pinning. Even though the OMG didn't get done, I was able to go from this stack of blocks,
to having the top two rows sewn together and an additional 5 rows partially assembled.
Twinkle Stars
Tutorial by Andrea Feldbush of Soscrappy
|
I'm happy with the progress even though I didn't meet either goal. September has been a rough month on the personal front, news that's not mine to share has made life a bit stressful and uncertain. Unfortunately, the other shoe drops in October. Fingers crossed every thing works out and life evens out after the middle of the month.
Linking up with:
Meadow Mist Designs Mosaic Mystery September Linky Party
Monday Making
Monday Design Wall