It was a slow week on the sewing front. I was in Denver for a conference for much of the week. Drama Teen had summer league volleyball the day after I got home, so we spent Thursday in Tulsa. Yesterday was spent on errands and a late afternoon nap. So not much time in the sewing room. The only quilt related thing I've done is play in EQ. So far this is the only layout I've worked up for the butterfly panel that arrived a couple of weeks ago.
I've got some other layouts I want to play with before I start picking out fabrics and cutting into them.
I did do some stitching on Jigsaw before I left for the conference, but I'm resewing the blocks I un-sewed last week, so that fabric has already been counted. This week's stash report looks a bit anemic.
Used last week: 0 yards
Added last week: 0 yards
Used in 2014: 8.74 yards
Added in 2014: 225.05 yards
Net stashed in 2014: 216.31 yards
At least there was nothing coming in over the last week. I hope to get some time in the sewing room this afternoon, so I have hopes of having something to report next week.
I'm linking up with Patchwork Time's weekly stash report. Hop over and check out other stash management strategies.
I like your butterfly layout.
ReplyDeleteLove the butterfly layout! and am looking forward to seeing the completed quilt!
ReplyDeleteThe butterfly layout looks great! I love using EQ.
ReplyDeleteGood plan for the panel! And EQ playing is always fun. :)
ReplyDelete