Pages
Monday, February 28, 2022
Brewed Potions
Sunday, February 27, 2022
Stitching Stuff: Week 9 of 2022
- 15 minute days/week = 7/7 days
- 15 minute days/February = 26/26 days
- 15 minute days/2022 = 55/57 days
- Success rate = 96.49%
Powered by... Mister Linky's Magical Widgets.
Tuesday, February 22, 2022
To Do Tuesday for the Week of 2/22/2022
- Potions: Assemble rows ✔
- Cabins and Fans: Finish stitching down binding - progress
- Macaron Mystery: Work on January and February clues ✔
- Rhododendron Mystery: Work on blocks A and B ✔
- Unity: Make flying geese as leaders and enders ✔
Monday, February 21, 2022
Potions Progress
I'm not ready for a new week. It's going to be a rough one on several fronts. I'm slated for jury duty this week. I called on Friday and the message was to call again on Tuesday to see if I have to show up on Wednesday. But we are supposed to get freezing rain and sleet starting sometime on Wednesday into Thursday. We'll see how all of that works out.
The weekend was quiet with much of it spent in the sewing room. The Potion blocks have been sewn into rows and the dark blue sashing strips have been attached.
Potions: Pattern by Flying Parrot Quilts |
I'm actually ahead of schedule on this project. There are six sashing strips of the background fabric that need to be added between the rows, and at the top and bottom of the quilt. That's the plan for this week. The pattern doesn't include borders, but I'll probably add a very narrow one of the dark blue as a frame. We'll see how it all looks once it's assembled.
Progress on my other projects has been pretty slow with all the focus on getting Potions far enough along to send it out for quilting. Linking up with Monday Design Wall, Making Monday and Patchwork and Quilts.
Sunday, February 20, 2022
Stitching Stuff: Week 8 of 2022
- 15 minute days/week = 7/7 days
- 15 minute days/February = 19/19 days
- 15 minute days/2022 = 48/50 days
- Success rate = 96.0%
Powered by... Mister Linky's Magical Widgets.
Saturday, February 19, 2022
Photo Challenge Week 34: A Panorama
Tuesday, February 15, 2022
To Do Tuesday for the Week of 2/15/2022
- Potions: Finish all the flask blocks ✔
- Cabins and Fans: Attach binding and start hand sewing ✔
- Macaron Mystery: Work on the January clue ✔
- Rhododendron Mystery: Make hour glass blocks for block B ✔
- Unity: Make flying geese as leaders and enders. ✔
Monday, February 14, 2022
Brewing Potions
Sunday, February 13, 2022
Stitching Stuff: Week 7
February is almost half gone. I'm on track with things in the sewing room, so I'm OK that the month seems to be speeding by. Work has been mostly calm, so it's been a lot easier to find the time and energy to stitch each day.
- 15 minute days/week = 7/7 days
- 15 minute days/February = 12/12 days
- 15 minute days/2022 = 41/43 days
- Success rate = 95.35%
This graph of quilts completed each year has made a couple of appearances on the blog over the years. You can clearly see I've never been able finish more than 7 quilts in one year. I've had a goal in the past to finish 8 quilts in a year. But it hasn't happened yet. So I finally decided that 7 is probably the best I can do while I'm still working full time. My average over the last 18 years is 4 finishes per year. I didn't manage that last year, but last year work was a nightmare, so I'm happy with the 3 finishes for 2021.
The last graph is the number of active projects. This is the UFOs, plus all the projects that are less than a year old. So this is reflects all the new projects I start in a year. I made a conscious effort to limit new starts 3 years ago. To hold the number constant it means I've at least finished what I've started the last couple of years. It should be obvious that new starts also drives the UFO list, but I don't think I really connected them till I looked at it graphically.
1. Ivani 2. maggie f 3. karen 4. Melissa G 5. DonnaleeQ 6. Julie in GA | 7. Gretchen 8. Andre at Quilting and Learning 9. Shasta @ High Road 10. Frederique 11. Colletta's Kitchen Sink 12. Sherrie | 13. Amanda 14. Meloney 15. DawnyK 16. Carol @ Quilt Schmilt 17. Quilting Gail |
Powered by... Mister Linky's Magical Widgets.
Saturday, February 12, 2022
Photo Challenge Week 33: A Knife
Scientist in Training: Blunt Force Trauma |
She does enjoy her apples. The photo title is what she sent me. "A Knife to the Heart" would probably have been my choice.
Tuesday, February 8, 2022
To Do Tuesday for the Week of 2/8/2022
We are already a week into February. With it being such a short month, we'll be at the end of it before we know it. January always seems to drag, but February just flies. It's Tuesday, so it's time to draw up a new To Do List and link up with Linda of Texas Quilt Gal for this week's To Do Tuesday. Before getting to this week's list, I should look at the progress on last week's list.
To Do List for Week of 2/1/2022
- Potions: Make 7 flask blocks ✔
- Cabins and Fans: Trim quilt, make binding, print label ✔
- Macaron Mystery: Work on January clue ✔
- Rhododendron Mystery: Work on Block A and Block B ✔
- Unity: Make flying geese as leaders and enders ✔
Potions: pattern from Flying Parrots Quilts |
Cabins and Fans (Fluorescence): self designed |
The quilt is trimmed, label and binding made, so all that's left is to get the binding on the quilt and stitched down. With the focus on Potions, I won't get the hand stitching done this week, but this should be finished before the end of the month.
Macaron Mystery: Meadow Mist Designs 2021 Mystery quilt |
Not a lot of progress this week, but the pile of dual flying geese blocks has grown a bit. I've been stitching one pair of geese with all the flask blocks, so it's slow going. At least there is some progress. Work will pick up once Potions is out for quilting.
Monday, February 7, 2022
Mixing up Potions
Potions: By Flying Parrot Quilts |
Sunday, February 6, 2022
Stitching Stuff: Week 6 of 2022
Weekends always go so fast. I'm not sure what happened to Saturday, but it's definitely Sunday now. Last weekend is just a blur. My apologies for not posting last Sunday. I did eventually get a stitching stuff post up, but not till late on Monday. Work intervened in what should have been an uneventful weekend. Thankfully by Monday, the issue was resolved and I was back to my regular schedule by that afternoon. Still my stitching time did take a hit early in the week.
- 15 minute days/week = 6/7 days
- 15 minute days/Jan = 29/31 days
- 15 minute days/Feb = 5/5 days
- 15 minute days/2022 = 34/36
- Success rate = 94. 44%
1. Frederique 2. Julie in GA 3. Gretchen 4. Ivani 5. maggie f 6. Meloney 7. karen | 8. Melissa G 9. Shasta @ High Road 10. DonaleeQ 11. Melisa - Pinker n Punkin Quilting 12. Andre 13. Colletta's Kitchen Sink 14. Jennifer in Indy | 15. DawnyK weeks 5 and 6 16. Amanda 17. Dq at Dreamworthyquilts 18. Carol @ Quilt Schmilt 19. Quilting Gail |
Powered by... Mister Linky's Magical Widgets.