Pages

Monday, September 9, 2013

Design Wall Monday - September 9th

It was a busy weekend with a volleyball tournament on Saturday, which meant laundry had to wait till Sunday. Then it was pack, drive to the airport and catch a plane for a training class in Houston.  So not much sewing happened over the weekend. The back for Mon Ami is almost finished, but that's not something real exciting to show for Design Wall Monday.  The only project with visiable progress is Back to Square One.   All the work for Clue #5 is just about done.  

Back to Square One
by Judy Laquidara (pattern available here)

All the white bordered Economy Patches are finished, they just need to be sewn to the blue bordered patches.  I'm hopeful that by next weekend Clue #5 will be completed.  

That's it for my design wall this week.  Check out all the other eye candy over at Patchwork Times.  

6 comments:

  1. And I'll bet you didn't pack your sewing machine to use in the hotel, did you? So busy and yet you did get some sewing done and progress shown. Good for you!

    ReplyDelete
  2. Some weeks massive progress just doesn't happen. I've noticed though that quilts get done by degrees so you're still moving towards a finish.

    ReplyDelete
  3. Love how this quilt is coming together. As a mom of two teenaged daughters in volleyball right now, I can sympathize with your schedule but enjoy every minute of watching them play.

    ReplyDelete
  4. Looks like perfect piecing on Back to Square One.....I also like the colors you have chosen!

    ReplyDelete
  5. Love your color choices, they are very sophisticated! Hope the training trip isn't a drag :)

    ReplyDelete

Thank you for taking the time to leave a comment. I appreciate your feedback and ideas. I try dilgently to reply to all comments (It may take me a few days, but I eventually get there). If you are a no reply blogger, I can't reply back. Please check that your settings are set to show your email. Thanks for stopping by!