The big thing that sticks in my mind for August is just how hot it was all month. Normally we get those triple digit temps for a couple of weeks. It was pretty much the whole month, with just a few days of temps dipping into the 90's. It was a good month for sewing, it was too hot to do much else. No finishes last month, but there was still enough progress to do an August PHD report to link up with Ms. P Designs.
No finishes, but there was a new project started last month. It was a project I planned to start this year. It's a quilt along that won't finish till next year, so it doesn't have to get done this year. I've done pretty well at limiting the squirrels this year. This is my first new start since January.
Celtic Solstice, the 2013 Bonnie Hunter Mystery, has been on and off to my to do list since June of this year. There was finally some progress on this UFO in late August. It's my last unassembled BH mystery. All the 4-patch chain blocks are finished. Now to work on the piece heavy main block. That's going to go pretty slowly.
The next quilt to go out for long arm quilting is Squared Away (2018 Rainbow Scrap Challenge Sampler). This is another quilt for one of My Girl's college buddies. The plan was to pull a backing from the stash, but nothing I pulled worked. So we decided to take advantage of a sale and buy an extra wide backing. The plan is to get this to the long arm quilter before I leave to visit My Girl later this month.
Good Fortune (Bonnie Hunter) has moved from a set of blocks to a finished quilt top this month. I'm really happy with how it turned out. The pieced border was definitely worth doing. Now it goes into the to be quilted closet.
Work on the teal blocks for my version of Wild and Goosey (Bonnie Hunter) continued in August. Just 4 blocks to go and I'll be ready to sash the 3" finished blocks into 7" finished blocks for quilt assembly.
The quilting has been slow going on Glowing Hearts (Sandra Walker). I picked a denser quilting motif, so of course it's going to take more time. It's going to be worth it, I really like how it's turning out. Based on where I'm at, this going to be a September/October finish.
All the blocks for the 2026 Guild BOM have been made. Only the blocks through September are shown in the photo since that's all the guild has seen. I'm working on the quilt assembly instructions, with plans to start that in late September after the October block is shown to the guild. I need to get this quilt to finished quilt top so I can move on to next year's BOM and have that ready to go for the December meeting.
Marigold Mystery (Meadow Mist Designs) is the new project started this month. The August blocks are all finished. This is my 11th Meadow Mist Designs' mystery sew along. I've enjoyed all of them. The sew along doesn't end until next April, so I'm looking forward to several months of clues.
August was a good month. No finishes, but one project reached finished quilt top stage and another one is ready to prep for quilting. A new project was added, but it was a planned one.
All the work this month means there's a good chance for at least 2 more finishes before the end of the year. I'll take that!









No comments:
Post a Comment
Thank you for taking the time to leave a comment. I appreciate your feedback and ideas. I try dilgently to reply to all comments (It may take me a few days, but I eventually get there). If you are a no reply blogger, I can't reply back. Please check that your settings are set to show your email. Thanks for stopping by!