Pages

Wednesday, September 2, 2026

August PHD Report

The big thing that sticks in my mind for August is just how hot it was all month.  Normally we get those triple digit temps for a couple of weeks. It was pretty much the whole month, with just a few days of temps dipping into the 90's. It was a good month for sewing, it was too hot to do much else.  No finishes last month, but there was still enough progress to do an August PHD report to link up with Ms. P Designs.  




No finishes, but there was a new project started last month. It was a project I planned to start this year.  It's a quilt along that won't finish till next year, so it doesn't have to get done this year.  I've done pretty well at limiting the squirrels this year. This is my first new start since January.  




Celtic Solstice, the 2013 Bonnie Hunter Mystery, has been on and off to my to do list since June of this year.  There was finally some progress on this UFO in late August.  It's my last unassembled BH mystery. All the 4-patch chain blocks are finished. Now to work on the piece heavy main block.  That's going to go pretty slowly.   




The next quilt to go out for long arm quilting is Squared Away (2018 Rainbow Scrap Challenge Sampler).  This is another quilt for one of My Girl's college buddies. The plan was to pull a backing from the stash, but nothing I pulled worked.  So we decided to take advantage of a sale and buy an extra wide backing.  The plan is to get this to the long arm quilter before I leave to visit My Girl later this month. 



Good Fortune (Bonnie Hunter) has moved from a set of blocks to a finished quilt top this month. I'm really happy with how it turned out.  The pieced border was definitely worth doing.  Now it goes into the to be quilted closet. 




Work on the teal blocks for my version of Wild and Goosey (Bonnie Hunter) continued in August. Just 4 blocks to go and I'll be ready to sash the 3" finished blocks into 7" finished blocks for quilt assembly.  




The quilting has been slow going on Glowing Hearts (Sandra Walker).  I picked a denser quilting motif, so of course it's going to take more time. It's going to be worth it, I really like how it's turning out.  Based on where I'm at, this going to be a September/October finish. 




All the blocks for the 2026 Guild BOM have been made. Only the blocks through September are shown in the photo since that's all the guild has seen.  I'm working on the quilt assembly instructions, with plans to start that in late September after the October block is shown to the guild.  I need to get this quilt to finished quilt top so I can move on to next year's BOM and have that ready to go for the December meeting.   

  



Marigold Mystery (Meadow Mist Designs) is the new project started this month.  The August blocks are all finished.  This is my 11th Meadow Mist Designs' mystery sew along. I've enjoyed all of them.  The sew along doesn't end until next April, so I'm looking forward to several months of clues.   

August was a good month. No finishes, but one project reached finished quilt top stage and another one is ready to prep for quilting.  A new project was added, but it was a planned one.  




All the work this month means there's a good chance for at least 2 more finishes before the end of the year.  I'll take that!    

Tuesday, September 1, 2026

To Do List for the Week of 9/1/2026

August seemed to go both fast and slow. The high temperatures did make the month drag a bit.  I'm ready for autumn temps, but I'm not ready for it to be September.  If this year is like past years, I'll blink and it will be December!  

The last week of August was a productive one. My to do list was pretty short, which is probably why I got so much done on each item.  

To Do List for 8/25/26

1. Glowing Hearts: Continue quilting ✔
2. Squared Away: Decide on backing 
3. Celtic Solstice: Work on incomplete blocks 
4. Wild and Goosey: Continue making teal blocks 

I'm hoping to do as well with this week's list, though it is a bit longer.  

To Do List for 9/1/2026

1. Glowing Hearts (Sandra Walker): Continue quilting





Last week I finished the second block and got halfway with the block 3.  I've found a few tips that have made the progress go faster. Fingers crossed I can get most of the next row done this week. 

2. Squared Away (Soscrappy): Press, cut and prep backing 





My Girl picked out the backing fabric. I chose an extra wide backing fabric.  It's nice not to have any seams, but I will admit, it's not fun to man handle from a pressing and cutting perspective.  But I'll be glad to have it ready to go.  

3. Celtic Solstice (Bonnie Hunter): Continue working on blocks





All the 4-patch chain blocks are finished and I got started on the main block.  I've cut all the pieces needed for the chevron components and started piecing those.  I have enough of the other block components to make 5 of the main blocks.  After a bit of review and some calculations, a cutting list has been created. I'm hoping to get the rest of the pieces cut this week so all I'll have to do is sew the blocks.    

4.  2026 Guild BOM: Finish assembly instructions, start cutting finishing pieces

I need to wait till after the September guild meeting before I start the quilt assembly, but it's not too early to finish up the instructions and cut my pieces. I have a trip planned to see My Girl later in the month, this would be a good "kit" to take with me and work on during my visit.  

5. Wild and Goosey (Bonnie Hunter) Continue making teal blocks

I know the RSC color is purple, but I only need a four more teal blocks and I'll be finished with those. Once those are done, I'll switch over to finishing up the purple ones.  

It's a pretty doable list.  We'll see how far I can get in a week.  Linking up with the Quilt Schmilt for To Do Tuesday.